Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn. Bhd. /

Abd Rahman Fahmi Mat Hasan

Analyze the inefficient takt time production and high customer complaint for support wheel carrier component to improve Lean production system level at Autokeen Sdn. Bhd. / Abd Rahman Fahmi Mat Hasan - Kuantan, Pahang : UMP, 2012 - xiii, 59 p. : ill. (some col.) ; 30 cm.

Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012

Bibliography : p. 58

THE0007531(Local)


Production control
Lean manufacturing

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us