Simulation of industrialised building system components production /

Mohd Amirul Azraf Abd Hamid

Simulation of industrialised building system components production / Mohd Amirul Azraf Abd Hamid - Kuantan, Pahang : UMP, 2012 - [xvi], [105 p.] : ill. ; 30 cm.

Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang – 2012

Bibliography : p. [98-99]

THE0003515(Local)


Industrialized building

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us