Building information modelling (bim) execution plan framework : (Record no. 100251)

MARC details
000 -LEADER
fixed length control field 04567ntm a2200361 i 4500
003 - CONTROL NUMBER IDENTIFIER
control field MY-KuUP
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251125110825.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field t||||fr|||| 000 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240105t20232023my a|||fr|||| 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0009816 (Local)
Qualifying information Hardback
040 ## - CATALOGING SOURCE
Original cataloging agency UMPSA
Language of cataloging eng
Transcribing agency UMP
Description conventions rda
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FTKA .R53 2023 r Thesis
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Ahmad Ridzuan Bin Abu Bakar,
Relator term author.
245 10 - TITLE STATEMENT
Title Building information modelling (bim) execution plan framework :
Remainder of title a case study of pre-approved plan (pap) design modelling project in the public work department (pwd) of malaysia /
Statement of responsibility, etc. Ahmad Ridzuan Bin Abu Bakar
264 #1 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture Kuantan, Pahang :
Name of producer, publisher, distributor, manufacturer UMPSA,
Date of production, publication, distribution, manufacture, or copyright notice 2023
264 #4 - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Date of production, publication, distribution, manufacture, or copyright notice ©2023
300 ## - PHYSICAL DESCRIPTION
Extent x,112 pages :
Other physical details illustrations (some color) ;
Dimensions 30 cm. +
Accompanying material 1-CD ROM
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
337 ## - MEDIA TYPE
Source rdamedia
Media type term computer
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term computer disc
347 ## - DIGITAL FILE CHARACTERISTICS
Source rda
File type text file
Encoding format PDF
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Master of Science) -- Universiti Malaysia Pahang – 2023
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Building Information Modelling (BIM) is a process of preparing, using, and sharing 3D models through digital technology that contains various formats that can be used by every party involved to achieve multiple objectives throughout the project implementation phase. BIM is a new method in construction projects to enhance project delivery systems. Hence, BIM Execution Plan (BEP) must be developed as a planning and monitoring strategy document to ensure all project deliverables are completed according to the project goals. A proper BEP helps stakeholders understand and achieve the underlying objectives of using BIM. Several BEPs have been developed worldwide since 2010 and used in new project development. This document is tailored to suit the type of project, stakeholder requirement, and project objectives to ensure BIM implementation success. Meanwhile, Public Works Department (PWD) has produced a lot of standard drawings since the 1980s, which have been used previously in many projects such as schools and health clinics. Most of the projects have been completed and the building's design has filled client and authority requirements though some of the amendments to the plan and drawing discrepancies have been made during the construction stage. Since these drawings can be used several times, PWD has rebranded these drawings as a Pre-Approved Plan (PAP) and took the initiative to collect and preserve all these drawings for future project use. To enhance the quality of the PAP drawing and align with government digitalisation's agenda, PWD has decided to migrate these drawings to the BIM model staggered by several stages. The main objective is to produce the PAP coordinated model, which can reduce drawing mistakes and increase design and construction productivity. Hence, the PWD has decided to implement BIM in the PAP Design Modelling Project. Considering the existing BEP focuses only on new project development, and there is no standard or guide to prepare the BEP for this type of project, this research has been conducted to establish the BEP framework for PAP Design Modelling Project. Therefore, the main objectives of this study is to compare and explore the key elements of twenty (20) existing BEP samples. Second objective is to explore the key elements of the PAP Design Modelling Project's BEP, and lastly the third objective is to establish the suitable BEP framework for PAP Design Modelling Project based on twenty (20) BEP samples and PAP Design Modelling Project’s case study. The research methodology is qualitative: data collection, content analysis, sample comparison and interviews. The data collection consists of the BEP samples, which was reviewed as a fundamental comparison. The interview session involved the team members in PAP Design Modelling Projects. The research findings compare the key elements in BEP samples and BEPs provided in the case study. Hence, the BEP framework defined and validated based on comparing and analysing BEPs. The improvement recommendation has covered the enhancement of the BEP and the BEP development for other types of projects, which can help the construction industry player to expand the potential of BIM usage in various projects.
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering Technology
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Thesis
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Collection Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan Reference UMPLIB GAMBANG UMPLIB GAMBANG 05/01/2024   FTKA .R53 2023 r Thesis T000002838 05/01/2024 1 05/01/2024 Thesis
  Not lost Library of Congress Classification   Final Processing Non-fiction UMPLIB GAMBANG UMPLIB GAMBANG 05/01/2024   CD13494 T00002839 05/01/2024 1 05/01/2024 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us