MARC details
| 000 -LEADER |
| fixed length control field |
02212nam a2200253 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000045477 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204413.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
100430t2008 my a f m 000 0 eng dd |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007266(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905141128 |
| Level of effort used to assign nonsubject heading access points |
fawwaz |
| Level of effort used to assign subject headings |
201107132226 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
201004301203 |
| Level of effort used to assign classification |
ida |
| -- |
201004301151 |
| -- |
ida |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TL255.2 .F37 2008 rs Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Muhammad Farid M Fathil |
| 245 10 - TITLE STATEMENT |
| Title |
Painting process improvement for automotive industry / |
| Statement of responsibility, etc. |
Muhammad Farid Bin M Fathil |
| 246 3# - VARYING FORM OF TITLE |
| Title proper/short title |
Painting process improvement for automotive industry |
| Medium |
[electronic resource] |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2008 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xvi, 46 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 computer disc |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Mechanical Engineering with Automotive Engineering) -- Universiti Malaysia Pahang - 2008 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 43-44 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Painting process is an important process in automotive industry. The purposes of the process are to give more attractive appearance to the vehicles and to provide the layer of protection against corrosion and weathering. The painting process are include a few other process, which are Pre-Treatment and Electrodeposition (ED) Process, ED sanding, process, sealant and PVC process, primer process, and top coat process. The objective of the project are to identify the problems occur in ED sanding process and reduce the problems to improve the ED sanding. The study was done at AMM plant in Pekan, Pahang. The methods used to identify the problems are based on the four M method, which are Manpower, Machine, Method, and Materials. The study implement total quality management tools to analysis the problems. From the study that have done, the major problems are the foreign material and the scratch. The foreign material can be reduced by making the solvent so that the layer of anti-corrosion can be eliminate. Meanwhile, the scratch is cause by manpower. The lesss the worker touch the vehicle body, the less scratch formed on the vehicle surface body. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Automobiles |
| General subdivision |
Painting |