MARC details
| 000 -LEADER |
| fixed length control field |
03040nam a2200253 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000040743 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204415.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
090723t2008 my a f m 000 0 eng|d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007513(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905161446 |
| Level of effort used to assign nonsubject heading access points |
fawwaz |
| Level of effort used to assign subject headings |
201107132231 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
201011091807 |
| Level of effort used to assign classification |
ida |
| Level of effort used to assign subject headings |
200908141651 |
| Level of effort used to assign classification |
VLOAD |
| -- |
200907231505 |
| -- |
ida84 |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TS156.2 .N35 2008 rs Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Mohd Najmi Mohamad |
| 245 10 - TITLE STATEMENT |
| Title |
Body assembly process improvement for automotive industry / |
| Statement of responsibility, etc. |
Mohd Najmi Mohamad |
| 246 3# - VARYING FORM OF TITLE |
| Title proper/short title |
Body assembly process improvement for automotive industry |
| Medium |
[electronic resource] |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2008 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
55 p. : |
| Other physical details |
ill. ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 computer disc |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Mechanical Engineering with Automotive) -- Universiti Malaysia Pahang - 2008 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
An automotive body assembly system consists of many individual sub-assemblies and sheet metal parts welded. The objective in this project is to identify the problem that always happens in line assembly. Then improve the problem in line assembly to overcome from the problem arise. Hence make a comparison and find a solution about body assembly to improve the problem from the data analysis. At body assembly process there are several problem could happen such as miss the spot part, dent or hump, scratch, spatter burr and hole to the body during assembly. But the major problem happen at line assembly is spot weld and men mistake. By using 4M method which includes machine, method, material and man, this problem can be identify easily and effected. As a result there are some problem that contributes to the problem happen such as logistic problem which involve the wrong part delivery and wrong shipment. Besides that, man power and workability also be the problem to the line assembly. Lack of discipline, behaviour and competency of worker give a worse impact to the company. Wrong workability involves many of tools, machine and man power and affected the production and flow in line assembly. Spot welding becomes a problem when the current voltage supply is not enough and it can work properly. Lastly jigs and fixture need to be right servicing schedule to make sure the machine and tools are in good condition and avoid the problem happen used it. The method were used to make the analysis data is by making study case at AMM factory which more focus at body assembly line and problem occur during the process. From the data collected, analysis data can be done and improve the problem that always happen in line assembly. Hence it gives benefit to the company either in productivity or working environment from the solution has done. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Assembly-line methods |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Automobile factories |