MARC details
| 000 -LEADER |
| fixed length control field |
02364nam a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000040601 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204427.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
090720t2008 my a f m 001 0 eng|d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0005561(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905161512 |
| Level of effort used to assign nonsubject heading access points |
hanafiah |
| Level of effort used to assign subject headings |
201107132320 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
201005201204 |
| Level of effort used to assign classification |
ida |
| Level of effort used to assign subject headings |
200908141650 |
| Level of effort used to assign classification |
VLOAD |
| -- |
200907201441 |
| -- |
ida84 |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
T58.8 .F35 2008 rs Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Wan Faizul Wan Mustafa |
| 245 10 - TITLE STATEMENT |
| Title |
Productivity improvement in industry by using witnes software / |
| Statement of responsibility, etc. |
Wan Faizul Wan Mustafa |
| 246 3# - VARYING FORM OF TITLE |
| Title proper/short title |
Productivity improvement in industry by using witnes software |
| Medium |
[electronic resource] |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2008 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
66 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 computer disc |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2008 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Productivity is a method to measure the performance or efficiency in the industry, organization or factory. The project is focused on trim line production of Mercedes Benz car. The study are about to improve production productivity, reduce waiting time in production line, increase the production in one day in order to achieve the target, used up all the space in the factory usefully and increase the busy at production line to the maximum by using Witness software. Person in charge and workers interview is done to collect some information about the assembly line in determining problems occur. Other than that, direct observation method, archival data and self collecting data are used. Live experiments are conducted on production lines. Four problems are identified such as reworked, not enough manpower, delayed process, high waiting time, and low production which are not in the target for one day production. Interventions are made to rectify the problems such as to reduce waiting time in problem’s section by adding buffer which for temporarily storage for finished part in order to minimize waiting time for finished section sent the finish part without have to wait. As a result, the production productivity for the trim line production is increased. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Production management |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Industrial productivity |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Production control |