A success factors of design-build contracting from Malaysian contractor's perspectives / (Record no. 1864)

MARC details
000 -LEADER
fixed length control field 03221nam a2200253 a 4500
001 - CONTROL NUMBER
control field vtls000046029
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204428.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 100608t2009 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0003453(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151111
Level of effort used to assign nonsubject heading access points irma
Level of effort used to assign subject headings 201111241020
Level of effort used to assign classification Fida
Level of effort used to assign subject headings 201107132324
Level of effort used to assign classification VLOAD
Level of effort used to assign subject headings 201006081027
Level of effort used to assign classification ida
-- 201006081019
-- ida
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TH438 .A97 2009 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nor Azreen Ibrahim
245 12 - TITLE STATEMENT
Title A success factors of design-build contracting from Malaysian contractor's perspectives /
Statement of responsibility, etc. Nor Azreen Binti Ibrahim
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2009
300 ## - PHYSICAL DESCRIPTION
Extent xv, 90 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 computer disc
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2009
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 76-80
520 3# - SUMMARY, ETC.
Summary, etc. Design and Build system has become a significant alternative to the more traditional Design-Bid-Build though the level of its use varies from country to country. In local construction practice, the use of Design and Build method is rapidly increasing in both public and private sector. The rising popularity of Design and Build system is due to its advantages with regards to project duration, project cost and solutions of project problems. Unfortunately, besides its superiorities, Design and Build turns to be a risky contract system for both the owner and contractor unless the risks are identified in advance and managed throughout the project. The aim of this study is to know the success factors for Design and Build contracting. While, the specific objectives of this study are to study the implementation between Design and Build contract and conventional contract in Malaysia, to identify the success factors and to rank the success factors of Design and Build project. The questionnaires were distributed by hand to the contractor Class ‘A’ and grade 7 and government bodies such as Public Work Department (PWD), Ministry of Home Affairs and Ministry of Education Malaysia in Klang Valley. The data from the questionnaire survey was analyzed in percentage and value of index by using frequency analysis and average index analysis. This study has showed that many factors can contribute to the success of Design and Build project. Results of the survey indicated the most important factors of Design and Build contract is project team commitment followed by contractor’s competencies, client's competencies and lastly risk and liability assessment. In conclusion, determination of Design and Build project as success factors is very important aspect of this study so that it can be used as guidance to practitioners/contractors that involved in Malaysian construction industry. Besides, it is also hoped that these findings can be used to overcome the factors that cause the contractors not to choose Design and Build contract and hopefully it will give some information and a new perspective about Design and Build contract to the contractors and construction industry in Malaysia.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction contracts
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction industry
General subdivision Management
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   TH438 .A97 2009 rs Bc. 0000046173 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 4387 | TH438 .A97 2009 rs Bc. 0000046174 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us