MARC details
| 000 -LEADER |
| fixed length control field |
03177nam a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000046515 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204430.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
100622t2009 my dao f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0005559(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905161500 |
| Level of effort used to assign nonsubject heading access points |
hanafiah |
| Level of effort used to assign subject headings |
201107132329 |
| Level of effort used to assign classification |
VLOAD |
| -- |
201006221249 |
| -- |
Fida |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
T58.8 .C44 2009 rs Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Chen, Choy Yuen |
| 245 10 - TITLE STATEMENT |
| Title |
Productivity improvement for pusat kesihatan pelajar (PKP) by using witness simulation software / |
| Statement of responsibility, etc. |
Chen Choy Yuen |
| 246 3# - VARYING FORM OF TITLE |
| Title proper/short title |
Productivity improvement for pusat kesihatan pelajar (PKP) by using witness simulation software |
| Medium |
[electronic resource] |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP , |
| Date of publication, distribution, etc. |
2009 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiv, 80 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 computer disc |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2009 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 61-62 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
As the world is improving rapidly, time is seems to be the most essential factor to decide the strength of competency of organization. In a short word, a company that can produce massive product or good services with high quality in a short timing is what efficiency means. With the respect of the project title, Productivity Improvement for Pusat Kesihatan Pelajar (PKP) By Simulation Software is meant to improve quality and the efficiency of the existing service process flow in PKP of Universiti Malaysia Pahang (UMP). The main project objectives are to design and improve service floor layout of this selected organization, analyzed the designed layout and select the best solution for PKP. The project is started by evaluating and identifying the problems existed in the service floor layout. Continue by data collection for the data analysis to choose the best goodness-of-fit test to proceed to the simulation modeling step. Meanwhile, there are three alternatives are suggested reducing the waiting area capacity, add-in a medical consultant and the last alternative is the combination of both alternatives. By running an experiment on the suggested alternatives to improve the output patient number, these alternatives are modeled in the WITNESS Simulation software and run for the experimental time of 4 hours. These results are analyzed by Kruskal-Wallis and one way ANOVA test for the best solution selection. The experimented results are then being compared with the Cost-effectiveness analysis to determine the most efficient layout that able to produce high output of patient number with lowest cost. From the findings, the most productivity improvement method is adding a medical officer in the service floor layout and reducing the waiting area capacity from 27 to 5 chairs. Furthermore, this approach is also minimized the lead time of giving medical consultant to patient. Hence, the objectives of this project have been achieved and the selected alternative will be proposed to the PKP for implementation. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Production management |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Simulation methods |