Productivity improvement for pusat kesihatan pelajar (PKP) by using witness simulation software / (Record no. 1941)

MARC details
000 -LEADER
fixed length control field 03177nam a2200265 a 4500
001 - CONTROL NUMBER
control field vtls000046515
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204430.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 100622t2009 my dao f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0005559(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905161500
Level of effort used to assign nonsubject heading access points hanafiah
Level of effort used to assign subject headings 201107132329
Level of effort used to assign classification VLOAD
-- 201006221249
-- Fida
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) T58.8 .C44 2009 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Chen, Choy Yuen
245 10 - TITLE STATEMENT
Title Productivity improvement for pusat kesihatan pelajar (PKP) by using witness simulation software /
Statement of responsibility, etc. Chen Choy Yuen
246 3# - VARYING FORM OF TITLE
Title proper/short title Productivity improvement for pusat kesihatan pelajar (PKP) by using witness simulation software
Medium [electronic resource]
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP ,
Date of publication, distribution, etc. 2009
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 80 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 computer disc
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2009
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 61-62
520 3# - SUMMARY, ETC.
Summary, etc. As the world is improving rapidly, time is seems to be the most essential factor to decide the strength of competency of organization. In a short word, a company that can produce massive product or good services with high quality in a short timing is what efficiency means. With the respect of the project title, Productivity Improvement for Pusat Kesihatan Pelajar (PKP) By Simulation Software is meant to improve quality and the efficiency of the existing service process flow in PKP of Universiti Malaysia Pahang (UMP). The main project objectives are to design and improve service floor layout of this selected organization, analyzed the designed layout and select the best solution for PKP. The project is started by evaluating and identifying the problems existed in the service floor layout. Continue by data collection for the data analysis to choose the best goodness-of-fit test to proceed to the simulation modeling step. Meanwhile, there are three alternatives are suggested reducing the waiting area capacity, add-in a medical consultant and the last alternative is the combination of both alternatives. By running an experiment on the suggested alternatives to improve the output patient number, these alternatives are modeled in the WITNESS Simulation software and run for the experimental time of 4 hours. These results are analyzed by Kruskal-Wallis and one way ANOVA test for the best solution selection. The experimented results are then being compared with the Cost-effectiveness analysis to determine the most efficient layout that able to produce high output of patient number with lowest cost. From the findings, the most productivity improvement method is adding a medical officer in the service floor layout and reducing the waiting area capacity from 27 to 5 chairs. Furthermore, this approach is also minimized the lead time of giving medical consultant to patient. Hence, the objectives of this project have been achieved and the selected alternative will be proposed to the PKP for implementation.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Production management
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Simulation methods
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   T58.8 .C44 2009 rs Bc. 0000046217 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 4409 | T58.8 .C44 2009 rs Bc. 0000046218 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us