MARC details
| 000 -LEADER |
| fixed length control field |
03372nam a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000052519 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204445.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
110330t2010 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007645(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905171206 |
| Level of effort used to assign nonsubject heading access points |
fawwaz |
| Level of effort used to assign subject headings |
201204041624 |
| Level of effort used to assign classification |
Fida |
| Level of effort used to assign subject headings |
201110041131 |
| Level of effort used to assign classification |
Fida |
| Level of effort used to assign subject headings |
201107140042 |
| Level of effort used to assign classification |
VLOAD |
| -- |
201103301303 |
| -- |
ida |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TS178 .T44 2010 rs Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Tee, Chun Teck |
| 245 10 - TITLE STATEMENT |
| Title |
Productivity improvement for furniture industry by using witness simulation software / |
| Statement of responsibility, etc. |
Tee Chun Teck |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2010 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xvi, 147 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2010 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 73-75 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
A furniture industry typically involves a number of stages, including receiving raw materials, cutting, sanding, laminating, shaping, drilling, brushing, assembly, and finishing. The longer of process cycle time, the frequent of machine downtime, and the poor layout of the factory have added to the complexity and challenges of furniture industry. With respect to the project title, Productivity Improvement for Furniture Industry by using WITNESS Simulation Software, Lein Hua Furniture Industry Sdn. Bhd. (LHF) has been selected to be improved. The objective for LHF has always been to achieve better productivity, reduce the processing time, minimize the machine downtime, and meet regulatory requirements. This study focuses on applying simulation method to improve the operations in the LHF industry. Therefore, the project objectives can be briefly explained as to design and improve the floor layout of LHF, analyze the designed layout and select the best solution. The project is started by evaluating and identifying the problems existed in the industry, continued by data collection for the data analysis and proceeds to applying simulation modelling step. Meantime, there are three alternatives for improving productivity are suggested and the best of it to be chosen. By running an experiment on the suggested alternatives to improve the output of chairs, these alternatives are modeled in the WITNESS Simulation software and run for the experimental time of 8 hours. These results are analyzed by Kruskal-Wallis and one way ANOVA test for the best solution selection. The experimented results are then being compared with the Cost-Effectiveness Analysis to determine the most efficient layout that are able to produce high output of chairs with lowest cost. From the findings, the most productivity improvement method is the Alternative 3, which is additional of a Laminating machine and reduction of a Brushing machine, as well as combination of Sanding II and Sanding III process after Drilling process. This approach increases the daily output of chairs from 44 to 46 units and the cost of chair per unit from RM45.53 reduced to RM43.63. Therefore, the objectives of this project have been achieved and the selected alternative will be proposed to the LHF for implementation. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Plant layout |
| General subdivision |
Planning |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Industrial productivity |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Furniture industry and trade |