Productivity improvement via simulation method (Manufacturing industry) / (Record no. 2506)

MARC details
000 -LEADER
fixed length control field 02633nam a2200265 a 4500
001 - CONTROL NUMBER
control field vtls000052367
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204450.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110328t2010 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0007639(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905171201
Level of effort used to assign nonsubject heading access points fawwaz
Level of effort used to assign subject headings 201703021508
Level of effort used to assign classification ida
Level of effort used to assign subject headings 201204041624
Level of effort used to assign classification Fida
Level of effort used to assign subject headings 201110041118
Level of effort used to assign classification Fida
-- 201103281303
-- ida
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TS178 .H37 2010 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Hasbullah Mat Isa
245 10 - TITLE STATEMENT
Title Productivity improvement via simulation method (Manufacturing industry) /
Statement of responsibility, etc. Hasbullah Mat Isa
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2010
300 ## - PHYSICAL DESCRIPTION
Extent xvii, 124 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2010
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 69-70
520 3# - SUMMARY, ETC.
Summary, etc. Productivity improvement plays an important role in determining whether a company can survive in the future based on customer demands that it can fulfill. In this respect, simulation can be utilized as a what-if analysis tool to decide which productivity improvement strategies to be adopted. This thesis presents a simulation of the current performance of outputs and profits using WITNESS simulation software. The main objective of this project is to demonstrate the use of simulation in analyzing the existing production floor performance and in evaluating various alternatives to overcome the existing problem. This project is conducted in an electronic connector manufacturing company located in Shah Alam, Selangor. The production line involved in this project is the assembly line for FX15 model while the product involved in this study is connector manufactured. First, a simulation study on the existing production line is carried out to evaluate the production floor performance. Results of the study revealed that the current production floor was suffering from time working handling. From here, a total of 3 alternative layouts were proposed and they were simulated to determine their effect on the production performance. One way ANOVA test with multiple comparisons was conducted to select the best result. The results again showed a significant difference between each alternative layout and the best alternative to improve the existing production line is the Alternative layout III with productivity increment of 9.15% higher the current situation.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Plant layout
General subdivision Planning
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Industrial floor space
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Industrial productivity
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   TS178 .H37 2010 rs Bc. 0000054061 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 5046 | TS178 .H37 2010 rs Bc. 0000054062 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us