MARC details
| 000 -LEADER |
| fixed length control field |
03074nam a2200253 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000029652 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204454.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
080624t2006 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0003444(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905141557 |
| Level of effort used to assign nonsubject heading access points |
irma |
| Level of effort used to assign subject headings |
201211021551 |
| Level of effort used to assign classification |
Fida |
| Level of effort used to assign subject headings |
201107132240 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
200908141459 |
| Level of effort used to assign classification |
VLOAD |
| -- |
200806241629 |
| -- |
fara |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TH437 .M64 2006 rs Thesis |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Mohd Johari Othman |
| 245 10 - TITLE STATEMENT |
| Title |
Planning & scheduling by using Microsoft Project : |
| Remainder of title |
a case study of "suggestion for construction and completion the Science Department for University Islam Antarabangsa Malaysia, Bandar Indera Mahkota, Kuantan, Pahang" / |
| Statement of responsibility, etc. |
Mohd Johari bin Othman |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
KUKTEM, |
| Date of publication, distribution, etc. |
2006 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xv, 118 p. : |
| Other physical details |
col. ill. ; |
| Dimensions |
30 cm. |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Civil Engineering) -- Kolej Universiti Kejuruteraan dan Teknologi Malaysia - 2006 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
The construction industry is significant in the development of the Malaysian economy towards its realization of achieving vision 2020 to attain the status of a fully developed nation. To implement construction project, a proper planning and scheduling is of vital important in order for the project to be executed and run smoothly. The best schedule is not the schedule showing the project completed in the shortest time period, it is the schedule that meets the primary objectives of the total project. Those primary objectives are to create a quality project, completed on time, within budget, and in a safe work environment. Therefore, the focus of this research is to conduct and exploratory study on developing planning and scheduling in construction project. To achieve the aim of the study, the following objectives has been identified such as to study the concept of planning and scheduling in construction project, to study the construction sequence of work for multi storey building and to produce S-Curve by application of Microsoft Project software. Two multi storey building project was selected and structured interview was conducted to experience personal who really involved in the construction project such as Project Manager, Planner Engineer and Project Engineer. The study has been carried out using case study method in which two samples of construction schedule has been evaluated and analyze in term on how to develop the scheduling. From the study, it was found on how the project was planned, the sequence of work and linking relationships between activities for the whole project. By choosing the best schedule of the project, then new schedule has been developed by using Microsoft Project 2003 until produce the S-Curve. In conclusion, no doubt that information from the research can benefit both the practiced and the education of project management. -Author |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Construction industry |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Industrial project management |
| Form subdivision |
Case studies |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Construction industry |
| General subdivision |
Data processing |