Productivity improvement using industrial engineering tools / (Record no. 2906)

MARC details
000 -LEADER
fixed length control field 02988nam a2200253 a 4500
001 - CONTROL NUMBER
control field vtls000052305
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204504.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 110325t2010 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0007512(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905161445
Level of effort used to assign nonsubject heading access points fawwaz
Level of effort used to assign subject headings 201204231111
Level of effort used to assign classification Fida
Level of effort used to assign subject headings 201110040954
Level of effort used to assign classification Fida
Level of effort used to assign subject headings 201107140026
Level of effort used to assign classification VLOAD
-- 201103251711
-- ida
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TS156.2 .H69 2010 rs Bc.
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name How, Sheng Boon
245 10 - TITLE STATEMENT
Title Productivity improvement using industrial engineering tools /
Statement of responsibility, etc. How Sheng Boon
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2010
300 ## - PHYSICAL DESCRIPTION
Extent xvii, 77 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2010
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 69-70
520 3# - SUMMARY, ETC.
Summary, etc. The aim of this study is to study the implementation of industrial engineering tools in selected manufacturing company to identify the highest defects occurred at the company production lines and propose new methods to the selected manufacturing company for defects reduction and thus improve the productivity of the company. The chosen company is NamHwa Paper Industries (M) SDN. BHD. and the product being analyzed is 1040mm paper. The study mainly focuses on 7 Quality Control. In order to achieve the objective of the study, firstly, the flow of process to produce 1040mm paper was observed. From the observation, there are total of 8 workstations at the company. The workstations are Slitter, Print, Slotter, Glue, Stitching, Partition, Die Cut and Tie workstation. Then, each frequency of defects at the workstation was collected by using check sheets. The data was then arranged according to the highest to lowest frequency in cumulative table and Pareto chart was build base on the cumulative table. Defect with the highest frequency can be identified and was chosen to be analyzed. The workstation chosen for analyzed was Glue workstation. Initially, the original methods imply at glue workstation has very much defects and did not achieve the targeted output. Hence, brainstorming needs to be done to build the cause and effect diagram as detailed as possible causes in each of the broad areas where the causes will be 4M which is Methods, Machines, Manpower and Materials. Based on the cause and effect diagram, solutions were generated. There are few suggestions that can suite the company and improve the productivity of NamHwa Paper Industries (M) SDN. BHD. The solutions are divided the glue paper box into few group before stacking up, use electric fan or airy place for glue workstation, and use table lamp or hair dryer. Cost reduction for each solution was calculated and the solution with highest cost reduction is chosen to increase the productivity of the company.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Industrial productivity
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Quality control
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   TS156.2 .H69 2010 rs Bc. 0000054029 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 5030 | TS156.2 .H69 2010 rs Bc. 0000054030 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us