Road preference survey for commuting trips from/to workplace / (Record no. 2926)

MARC details
000 -LEADER
fixed length control field 03272nam a2200265 a 4500
001 - CONTROL NUMBER
control field vtls000038851
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204505.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 090629t2008 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0003398(Local)
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0003399(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905141124
Level of effort used to assign nonsubject heading access points irma
Level of effort used to assign subject headings 201107132323
Level of effort used to assign classification VLOAD
Level of effort used to assign subject headings 201006071241
Level of effort used to assign classification ida
Level of effort used to assign subject headings 201006071238
Level of effort used to assign classification ida
-- 200906291257
-- kam
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TE279.3 .A44 2008 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ameey Azleenda Abd Rahim
245 10 - TITLE STATEMENT
Title Road preference survey for commuting trips from/to workplace /
Statement of responsibility, etc. Ameey Azleenda Binti Abd Rahim
246 3# - VARYING FORM OF TITLE
Title proper/short title Road preference survey for commuting trips from/to workplace
Medium [electronic resource]
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2008
300 ## - PHYSICAL DESCRIPTION
Extent 66 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 computer disc
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2008
520 3# - SUMMARY, ETC.
Summary, etc. A road is an identifiable route, way or path between two or more places. Road is typically smoothed, paved and otherwise prepared to allow easy travel for the road user. Transportation, traffic system and road network are the most important element which can influence level of development of the country. The objectives of this study are to identify the existing residential locations of UMP’s staff and their preferred commuting route to UMP and to determine their reasons in choosing the current residential locations and the preference commuting route to UMP. The roads involve is in between Jalan Kuantan – Gambang [FR2] and East Coast Expressway (LPT). At the moment, Jalan Kuantan – Gambang [FR2] is getting congested especially during AM & PM peak hours. On the other hand, East Coast Expressway (LPT) is under utilized due to a number of reasons. This study is basically carrying out based on that phenomenon and both roads had been selected as study area of this research. In this study, data collection is carrying out through e-survey, where the questionnaires had been distributed through e-mail to all staffs and lecturers of UMP. This kind of methodology is one kind of new method that being applied in final year project in UMP. The results show that, majority of the respondents prefers to choose Jalan Kuantan – Gambang [FR2] as their preferred road for commuting trips to workplace, which represent 89% of total percentage whereas 11% of respondents prefer to use East Coast Expressway (LPT) to go to workplace. The main reasons of Jalan Kuantan – Gambang [FR2] user is the location of their residential location, different with East Coast Expressway (LPT) user, as they more considering the factor of safety and comfortness of their daily journey to workplace. Poor accessibility of the highway from a main road may become the main reasons for the respondents not to use East Coast Expressway (LPT) as their daily commuting route to UMP. The action must be taken by responsible parties to plan and develop the new interchange of the highway in order to increase the numbers of road user. In the same time, it will reduce the congestion level of Jalan Kuantan – Gambang [FR2].
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Driveways
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Roads
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type Public note
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   TE279.3 .A44 2008 rs Bc. 0000037589 04/09/2019 1 04/09/2019 Final Year Report  
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   TE279.3 .A44 2008 rs Bc. 0000046129 04/09/2019 2 04/09/2019 Final Year Report c.2
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 4360 | TE279.3 .A44 2008 rs Bc. 0000046130 04/09/2019 2 04/09/2019 Final Year Report  

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us