A survey on problem faced by contractors using design and build contract / (Record no. 2939)

MARC details
000 -LEADER
fixed length control field 03303nam a2200265 a 4500
001 - CONTROL NUMBER
control field vtls000046030
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204505.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 100608t2009 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0003455(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151113
Level of effort used to assign nonsubject heading access points irma
Level of effort used to assign subject headings 201107132324
Level of effort used to assign classification VLOAD
-- 201006081032
-- ida
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TH438 .H35 2009 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nurhajar Abd Rahman
245 12 - TITLE STATEMENT
Title A survey on problem faced by contractors using design and build contract /
Statement of responsibility, etc. Nurhajar Binti Abd Rahman
246 3# - VARYING FORM OF TITLE
Title proper/short title A survey on problem faced by contractors using design and build contract
Medium [electronic resource]
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2009
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 87 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 computer disc
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2009
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. [72]-74
520 3# - SUMMARY, ETC.
Summary, etc. Design and build construction process has been part of the construction industry. Today, the process is growing rapidly in this industry. As it has been grown in popularity, design and build has evolved all manner of hybrids. However, Design and Build also not exclude were faced problem by contractors in the construction industry such as conflicts between contractor and other parties (consultant and owner), Inadequate experience of consultant, problems communication and coordination by contractor with other parties. The aims of the study are to study comparisons between designs & build contract and conventional contract, to identify the common problems and the factors faced by the contractor and to rank the common problems and the factors among contractors. The questionnaires were distributed to the contractor (Class A) registered with Pusat Khidmat Kontraktor (PKK) , grade 7 contractors which registered with construction industry development board CIDB Bumiputera companies and government agencies by hand at Klang Valley. The data from the questionnaire was analyzes in average index and frequency analysis. Result of the survey indicated, five of category problems were identified. There are problem in general aspect, problem in design aspect, problem in financial aspect, problem in quality aspect and problem in time aspect. From the analysis the highest degree of agreement in general aspects is conflicts between contractor and other parties (consultant and owner). It is followed with in quality aspects is change materials order by owner during construction, problem in design aspects is mistakes and discrepancies in design documents, problem in financial aspects is actual price for project higher than owner’s target price and problem in time aspects is delays in commencing work because under-estimated time needed to obtain statutory approvals. Based on the result obtained from questionnaires were identified the problems among contractor are not critical because overall the respondents are agree with that problem. Finally, the information gathered can be used for government sector and contractor to overcome the problem faced by the contractor using design & build contract.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction contracts
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction industry
General subdivision Management
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   TH438 .H35 2009 rs Bc. 0000046191 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 4396 | TH438 .H35 2009 rs Bc. 0000046192 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us