Overall equipment effectiveness (OEE) measurement analysis at hicom automotive manufacturers (Malaysia) / (Record no. 332)

MARC details
000 -LEADER
fixed length control field 03073nam a2200253 a 4500
001 - CONTROL NUMBER
control field vtls000078684
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204335.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 140527t2013 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0007496(Local)
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0007795(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201906131117
Level of effort used to assign nonsubject heading access points nadia
Level of effort used to assign subject headings 201905161436
Level of effort used to assign classification fawwaz
Level of effort used to assign subject headings 201406020858
Level of effort used to assign classification training1
Level of effort used to assign subject headings 201405271109
Level of effort used to assign classification training1
-- 201405270956
-- training1
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TS155.8 .K86 2013 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ku Mohd Suhail Ku Sulaiman
245 10 - TITLE STATEMENT
Title Overall equipment effectiveness (OEE) measurement analysis at hicom automotive manufacturers (Malaysia) /
Statement of responsibility, etc. Ku Mohd Suhail Ku Sulaiman
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xvi, 100 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Manufacturing Engineering) --Universiti Malaysia Pahang - 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 70
520 3# - SUMMARY, ETC.
Summary, etc. HICOM Automotive Manufacturers (Malaysia) is the company that produce automobile and it painting line have a capacity to produce 60,000 cars per year. Even though it has a high capacity in terms of design capacity, several problems occur in the Paint Shop Department. Problem in this department is the Overall Equipment Effectiveness (OEE) value does not achieve the standard and passable OEE for manufacturing company which is 65% and above. This study’s objectives are to identify problem that are affecting OEE measurement, to find suitable approach to increase OEE value and the third objectives is to propose a solution for reducing downtime rate. First method that will be used is to measure the current OEE value for each section. Current OEE value for PTED section is 32.61%, Sealant section is 28.66%, Primer section is 29.31% and the Top Coat section is 33.26%. Problems such as high downtime are more likely make the OEE value drop down. Using several tools for improvement, this problem can be eliminated or reduce. Tools such as control chart were being used to find the points that have problem and pattern that occur in the process. By reviewing the control chart, we can find the root causes of the problem by using Fishbone or Ishikawa Diagram. 5W and 1H Analysis also were being used to focus more on the problem that have high impact on the process thus propose a solution for each problems arise. New target can be achieved by eliminated the point that have high downtime and several improvement actions can be make in order to achieve new target OEE. By reviewing the propose solution, the value of OEE can be increase where PTED section increase to 66.36%, Sealant section increase to 51.92%, Primer section increase to 57.92% and Top Coat section increase to 52.93%. Even though some of section does not achieve the passable OEE value which is 65%-75% after propose solution, each section have improve and this may the first step for making the Paint Shop Department achieving the world class OEE value.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Quality control
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   TS155.8 .K86 2013 rs Bc. 0000080283 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Final Processing UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 7746 | TS155.8 .K86 2013 rs Bc. 0000080284 04/09/2019 1 04/09/2019 Restricted Collection

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us