Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd / (Record no. 3402)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02834nam a2200241 a 4500 |
| 001 - CONTROL NUMBER | |
| control field | vtls000065392 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20251114204521.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 121023t2012 my da f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
| International Standard Book Number | THE0007533(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] | |
| Level of rules in bibliographic description | 201905161502 |
| Level of effort used to assign nonsubject heading access points | fawwaz |
| Level of effort used to assign subject headings | 201211071423 |
| Level of effort used to assign classification | huda |
| -- | 201210231500 |
| -- | huda |
| 040 ## - CATALOGING SOURCE | |
| Original cataloging agency | UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | TS157.4 .L54 2012 rs Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Lim, Qian Bing |
| 245 10 - TITLE STATEMENT | |
| Title | Implementation of ordering kanban for supplier at company Proreka (M) Sdn Bhd / |
| Statement of responsibility, etc. | Lim Qian Bing |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Kuantan, Pahang : |
| Name of publisher, distributor, etc. | UMP, |
| Date of publication, distribution, etc. | 2012 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | xv, 84 p. : |
| Other physical details | ill. (some col.) ; |
| Dimensions | 30 cm. + |
| Accompanying material | 1 CD-ROM |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Bibliography : P.76-79 |
| 520 ## - SUMMARY, ETC. | |
| Summary, etc. | Lean Production System is a manufacturing management in which time can be shortened for customer order and delivery time; and service parts order can be increased through the elimination of all forms of waste. The main component for “Just-In-Time”, one of the pillars of Lean production System is "Pull System" or Kanban System. Kanban system is a pull system of inventory control that typically uses cards or bins to signal when materials or work-in-process should be moved forward; stock inventory is moved through production stages only when it is needed, and minimizing stock inventories. This is an important revolution in the concept of the Lean Production System. The objective of this research is to simulate Kanban policies for three major materials in warehouse of Proreka (M) Sdn Bhd which is a Malaysia Tier-1 vendor and manufacturer of automotive components. Another objective is to investigate the stock control efficiencies between Material Requirement Planning and Kanban System. The main target of this research is to implement small lot ordering by using Kanban policy to reduce the stock inventories. A simulation model of delivery frequency was developed for the replenishment process of the selected stocks to analyse the delivery frequency from supplier after Kanban implementation. The average stock holding before and after Kanban implementation was analysed to compare the stock control effectiveness between Material Requirement Planning and Kanban System. Interview session and survey by questionnaire were conducted to analyse the performance of Kanban System in point of view of employees. The result obtained indicated that Kanban policy can reduce stock inventories and improve the efficiency in stock control. Other significant improvements with the implementation of Kanban are such as physical condition of the manufacturing environment, production efficiency, and motivation of workers. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Just-in-time systems |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not lost | Not for loan | UMPLIB PEKAN | UMPLIB PEKAN | 04/09/2019 | TS157.4 .L54 2012 rs Bc. | 0000067439 | 04/09/2019 | 1 | 04/09/2019 | Final Year Report | |||
| Not lost | Not for loan | UMPLIB PEKAN | UMPLIB PEKAN | 04/09/2019 | CD 6278 | TS157.4 .L54 2012 rs Bc. | 0000067440 | 04/09/2019 | 1 | 04/09/2019 | Final Year Report |