MARC details
| 000 -LEADER |
| fixed length control field |
02409nam a2200253 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000066646 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204526.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
121120t2012 my d f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007530(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905161459 |
| Level of effort used to assign nonsubject heading access points |
fawwaz |
| Level of effort used to assign subject headings |
201212051002 |
| Level of effort used to assign classification |
huda |
| -- |
201211201232 |
| -- |
huda |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TS157 .Q89 2012 rs Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Muhammad Quyyum Sohaimi |
| 245 10 - TITLE STATEMENT |
| Title |
Analysis and countermeasure to improve a low takt production item based on LPS evaluation at Hicom Teck See Sdn. Bhd. / |
| Statement of responsibility, etc. |
Muhammad Quyyum Sohaimi |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2012 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiv, 77 p. ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 75-76 |
| 520 ## - SUMMARY, ETC. |
| Summary, etc. |
Toyota Production System (TPS) is derived from Toyota's original idea was just in time (JIT) which it is the idea of sakiichi Toyoda, Toyoda kinchiri their engineers, taiichi Ohno. Objective of this system is to design out a muda (waste), mura (inconsistency) and muri (work load). In Malaysia this system at first adopted in the automotive industry, especially in Proton and Perodua as well as their vendors. Hicom Teck See (M) Sdn. Bhd. is one of the Proton and Perodua vendors that produce parts made from plastic as the front bumper. From the results of evaluation of LPS in May 2011, Takt Production showed the lowest criteria, in order to solve this problem one of the seven QC tools are used, next by used CFMEA and FMEA for determined the potential of the root causes why the production is the lowest criteria. By obtaining these potentials occur this problem, suggestions for improving these criteria are shown. By taking one of the products produced Hicom Teck See, a case study have been done. For this case study, a visits to Hicom Teck See have been done, all data on these products is taken to produce a proposal. The proposal is expected to improve Takt production criteria, and thus increase the score assessment of LPS in the next evaluation. By prepare proposals, Hicom Teck can see self-improvement / kaizen at work stations to reduce the lead time to customers and reduce the workload on the operator. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Production control |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Production management |