Penentu kepimpinan berorientasikan pekerja dantugas terhadap kejayaan projek di kalangan kontraktor binaan di kuantan pahang / (Record no. 3579)

MARC details
000 -LEADER
fixed length control field 04522nam a2200253 a 4500
001 - CONTROL NUMBER
control field vtls000067721
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204527.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 121212t2012 my a f m 000 0 may d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0002358(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271156
Level of effort used to assign nonsubject heading access points shamsul
Level of effort used to assign subject headings 201710121521
Level of effort used to assign classification aishah
Level of effort used to assign subject headings 201212121157
Level of effort used to assign classification Fida
-- 201212121156
-- Fida
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) T56.8 .N67 2012 rs Thesis
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Noraini Misran
245 10 - TITLE STATEMENT
Title Penentu kepimpinan berorientasikan pekerja dantugas terhadap kejayaan projek di kalangan kontraktor binaan di kuantan pahang /
Statement of responsibility, etc. Noraini Misran
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2012
300 ## - PHYSICAL DESCRIPTION
Extent xvii, 193 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Thesis (Ijazah Sarjana Pengurusan Teknologi (Pengurusan Projek)) -- Universiti Malaysia Pahang - 2012
520 3# - SUMMARY, ETC.
Summary, etc. The construction industry is one of the most important sectors that contribute to the economy and a catalyst for other industries. However in recent years, there are several construction projects not being completed on time, scope and within budget due to several factors. Based on previous studies, this problem arises due to the weakness of human factors, especially from the aspect of ineffective leadership and weak leadership practiced by project managers and contractors in managing the project team. Many researchers have made a study and focuses on the importance of leadership as a key to the success of the project. Accordingly, this study is to identify the leadership characteristics that influence the success of the project. The objective of this study also to examine the influence and the relationship between employee-oriented and taskoriented leadership to the success of the project among contractors in the construction industry. The study also describes the leadership characteristics that influence the success of the project based on the contractor’s demographic background. The sample of this study were involved contractors class A, B, C, D, E and F, which involved in construction projects in the district of Kuantan Pahang. The sampling method using stratified random sampling . The sample size was about 278 contractors selected from the 993 contractors registered with the Contractors Service Centre (PKK) in Pahang. Data collection is of primary data obtained through questionnaire. This study answered the five main questions using factor analysis, one sample t-test, Pearson correlation analysis, one-way analysis of variance (ANOVA) and multiple regression analysis. The results of this study has shown that the overall level of the characteristics of employeeoriented and task-oriented leadership among contractors in Kuantan, Pahang is high in terms of providing services, develop employees, sharing power and decision making, visionary, leading and project team building. The results of Pearson correlation analysis proved that employee-oriented and task-oriented leadership was positively correlated with the success of a project in which the characteristics of visionary leadership has the highest correlation relationship to the success of the project, followed by project team building, leading, develop employees, providing services and finally is sharing power and decision making. Meanwhile, one-way analysis of variance showed that there were significant differences based on the four demographic factors of age, education level, experience and leadership training to the success of the project. These factors significantly influence the success of the project. Results of multiple regression analysis produced a model that can predict the success of the project based on the characteristics of employee-oriented and task-oriented leadership. The results of multiple regression analysis showed that the characteristics of visionary leadership is the most significant variable in determining the success of the project, followed by team building. In conclusion, this study developed a model framework results from this analysis indicates that project success is significantly influenced by the characteristics of the task-oriented leadership in terms of visionary and team building. Regression equation obtained for a model is a Successful Project = 2.160 + 0.360 (Visionary) + 0.318 (Project Team Building).
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project management
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Industrial engineering
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/24670/">http://ecollib.ump.edu.my/24670/</a>
Public note Library access only
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost Library of Congress Classification   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   T56.8 .N67 2012 rs Thesis 0000067914 04/09/2019 1 04/09/2019 Thesis
  Not lost Library of Congress Classification   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 6301 | T56.8 .N67 2012 rs Thesis 0000067915 04/09/2019 1 04/09/2019 Thesis

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us