The reduction of work in progress between process in strut production line of a manufacturing factory / (Record no. 3630)

MARC details
000 -LEADER
fixed length control field 02811nam a2200241 a 4500
001 - CONTROL NUMBER
control field vtls000066271
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204529.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 121114t2012 my da f m 10000 en dd
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0006855(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905291556
Level of effort used to assign nonsubject heading access points amirul
Level of effort used to assign subject headings 201301221041
Level of effort used to assign classification huda
-- 201211141612
-- huda
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TK5105.8885.S76 N23 2012 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nur Nadiah Mohammad Alwudin
245 1# - TITLE STATEMENT
Title The reduction of work in progress between process in strut production line of a manufacturing factory /
Statement of responsibility, etc. Nur Nadiah Mohammad Alwudin
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2012
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 52 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 51-52
520 ## - SUMMARY, ETC.
Summary, etc. In today’s competitive business world, companies require small lead times, low costs and high customer service levels to survive. Because of this, companies have become more customers focused. The result is that companies have been putting in significant effort to reduce their lead times. The purpose of this thesis was to reduce work in progress (WIP) between processes at ST (strut) production line in APM Shock Absorber Sdn Bhd. In order to achieve this, all processes that focus on three processes only which is ABW ABF, CO2 welding, and LET KHP. Some changes based on the Toyota Production System (TPS) were implemented, The results were then shown in Yamazumi chart and then the implementation were sustained in the standard operating procedure (SOP). APM Shock Absorber Sdn Bhd has more than 32 years’ experience of producing absorber for automotive part. Due to globalization and stiff competition, the reduction of WIP for each process is important so that they have a smooth production line flow and could maintain their customer satisfaction. It was found that the most appropriate method for lead time reduction was doing the visualization of current cycle time on Yamazumi chart. Another observation that was derived from the Yamazumi chart is the bottlenecks can be derived and waste at ST line can be eliminated by having Kaizen activity such as reduce waiting time and position the machine comfortably for the operator doing their process. Some other recommended changes based on applying TPS are reduction of work in process inventory (WIP), reduction of waiting time, stop the process to build in quality, collect more information, and implementation of the 5S methodology. By implementing these changes, the future state the of WIP can be reduce in between of the process and smooth production flow can occur.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Struts frameworks
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   TK5105.8885.S76 N23 2012 rs Bc. 0000067410 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 6264 | TK5105.8885.S76 N23 2012 rs Bc. 0000067411 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us