MARC details
| 000 -LEADER |
| fixed length control field |
02367nam a2200253 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000067145 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204531.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
121129t2012 my d f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007656(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905171211 |
| Level of effort used to assign nonsubject heading access points |
fawwaz |
| Level of effort used to assign subject headings |
201211290942 |
| Level of effort used to assign classification |
huda |
| -- |
201211290942 |
| -- |
huda |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TS180.5 .L56 2012 rs Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Lingenthiran Samylingam |
| 245 10 - TITLE STATEMENT |
| Title |
Improve material handling system in Hirotako Acoustic Sdn.Bhd’s : |
| Remainder of title |
logistic department area / |
| Statement of responsibility, etc. |
Lingenthiran Samylingam |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2012 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xii, 35 p. ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 35 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
This thesis deals with the improvement of material handling system in Hirotako Acoustics Sdn.Bhd. Logistic Department area. The first objective of this thesis is to reduce the unnecessary movement of the forklift in reducing the travelled distance and eliminate excessive oil usage. The second objective of this project is to reduce the time taken to load and unload racks and also the lead time of delivery. A video recorder was used to record the routines and then the data was analysed through the time study sheet which was provided in the company. Three different experiments were used in order to determine the correlation between the time taken, distance travelled and also oil usage. As result, it has been observed that as the distance decreases, the time taken to load and unload decreases, which indirectly reduced the lead time of delivery. By applying the new method the excessive oil usage can be reduced. As for the recommendation, we need to take into consideration about the time taken, oil usage, cycle time, the distance travels and also the unnecessary motions. So in future, we can measure the above mentioned properties to optimally select a proper material handling system for its specific application. The other alternatives such as electric forklift which consumed less oil and have more advantages than normal forklift also can be considered in order to less the expenses on oil. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Loading and unloading |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Loaders (Machines) |