MARC details
| 000 -LEADER |
| fixed length control field |
02614nam a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000069321 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204535.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
130329t2012 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007642(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905171203 |
| Level of effort used to assign nonsubject heading access points |
fawwaz |
| -- |
201303291122 |
| -- |
Fida |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TS178 .M84 2012 rs Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Syed Muhammad Adib Syed Mohd Zaki |
| 245 10 - TITLE STATEMENT |
| Title |
Productivity improvement via simulation in manufacturing industry / |
| Statement of responsibility, etc. |
Syed Muhammad Adib Syed Mohd Zaki |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2012 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiv,83 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Mechanical Engineering with Manufacturing Engineering) -- Universiti Malaysia Pahang - 2012 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 76-77 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Productivity improvement effort such as better layout arrangement, minimize the total production cost or maximize the throughput had been given great attentions in today manufacturing industries. However, to execute such improvements involve a big amount of money which normally be the cause that obstruct the improvements. Simulation has become one of the solutions to this problem and rapidly gaining the industry confident nowadays. This study aims to make improvement in terms of the company’s production layout which focusing to the sandwich bread production line. The study is conducted at Roti Temerloh Enterprise, a company which produces products such as sandwich breads, buns and cakes. Being considered as one of the Small and Medium Enterprises (SMEs), cost certainly be the big issues when improvement planning to be considered. Using WITNESS simulation software, the production of the sandwich bread will be modeled and some adjustment then reviewed through the simulation to come up with the improved alternatives layouts. Comparison analysis is carried out and the results show in increased of production up to 265 breads per day for alternative 1 and 581 breads per day for alternative 2 and 3. Machine utilization in term of idle time, busy time and blocked for; Alternative 1 86.69%, 13.49% and 0.49%, Alternative 2 66.49%, 26.82% and 6.69%, Alternative 3 69.64%, 25.04% and 5.32%. From the cost effectiveness analysis, the cost is RM2.06 per unit for Alternative 1 and RM1.49 per unit for Alternatives 2 and 3. Thus the suggested alternative is Alternative 3. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Plant layout |
| General subdivision |
Planning |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Industrial floor space |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Industrial productivity |