A study of performance analysis of fan coil unit system for FKM’s air conditioner / (Record no. 3835)

MARC details
000 -LEADER
fixed length control field 03384ntm a2200265 a 4500
001 - CONTROL NUMBER
control field vtls000072529
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204536.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 130620t2012 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0006018(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905151132
Level of effort used to assign nonsubject heading access points aida
-- 201306201547
-- huda
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TH7345 .N56 2012 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nina Nadia Sahim
245 12 - TITLE STATEMENT
Title A study of performance analysis of fan coil unit system for FKM’s air conditioner /
Statement of responsibility, etc. Nina Nadia Sahim
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2012
300 ## - PHYSICAL DESCRIPTION
Extent xv, 92 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2012
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 53
520 3# - SUMMARY, ETC.
Summary, etc. Air conditioning system is a process of ventilation, air movement, air cleanliness, dehumidifying and cooling in order to give comfort to occupant. In tropical climate countries like Malaysia, air conditioner is very important to cool building space. Currently, most of commercial building in Malaysia is equipped with air conditioner either by using split unit or central unit types. Installation of air conditioner requires heat gain estimation, so that the capacity of the installed air conditioner is suitable for the particular area and gives the best performance in its operation. This project is carried out to determine the heat gain and analyze performance of air conditioner at second floor Block 2. FKM buildings start the operation in 2009. In 2009, every building in FKM building is window glass single glazing without tinted film. Started from year 2011, those windows glass have been tinted to reduce glare and heat gain inside the room. Besides that, factor of recommended setting temperature by Malaysia government at 24 °C also affected the design of air conditioning system. Generally, the main air conditioning system working at FKM is central air conditioning system. A method has been implemented to obtain the heat gain which is cooling load temperature difference/cooling load factor, (CLTD/CLF) while for cooling capacity, energy equation throughout fan coil has been used. The heat gain study have been considered five rooms in the second floor Block 2 (lecture rooms) which are Lecture Room 5 (BK 5), Lecture Room 6 (BK 6), Briefing Room 8 (BT 8), Briefing Room 6 and 7 (BT 6 and 7), and Discussion Room 6, 7 and 8 (BP 6, 7 and 8). From these five rooms, there are only two rooms have been analyze the performance which are Bilik Kuliah 5 and Bilik Taklimat 8. The study of heat gain is conducted from 8.00 am until 5.00 pm. The result shows that the heat gains are 14.43 kW, 14.31 kW, 8.35 kW, 15.61 kW and 7.3 kW, respectively. The percentage comparison heat gain against cooling coil load with load for Briefing Room 8 and Lecture Room 5 are 34.45 % and 47.98 % less than the heat gain by rooms. It happened because the data for cooling coil load were taken at steady state condition, while the heat gain data were measured in unsteady state condition. Thus, the fan coil still capable to cooled the rooms in steady state conditions.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Air conditioning
General subdivision Equipment and supplies
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Ventilation
General subdivision Equipment and supplies
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Heating
General subdivision Equipment and supplies
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   TH7345 .N56 2012 rs Bc. 0000072795 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 6925 | TH7345 .N56 2012 rs Bc. 0000072796 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us