Blackouts mitigation of power system using fuzzy technique / (Record no. 3986)

MARC details
000 -LEADER
fixed length control field 01811nam a2200229 a 4500
001 - CONTROL NUMBER
control field vtls000074663
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204542.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 130924t2012 a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0007014(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201906131436
Level of effort used to assign nonsubject heading access points aida
Level of effort used to assign subject headings 201309241654
Level of effort used to assign classification training
-- 201309241157
-- training
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TK7880 .A36 2012 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Siti Nur Ain Abdul Kadir
245 10 - TITLE STATEMENT
Title Blackouts mitigation of power system using fuzzy technique /
Statement of responsibility, etc. Siti Nur Ain Abdul Kadir
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2012
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 41 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Electrical Engineering (Power Systems)) -- Universiti Malaysia Pahang - 2012
520 3# - SUMMARY, ETC.
Summary, etc. Recently, power system protection devices have often been blamed for contributing to system disturbance. Indeed, current major blackouts found that false tripping of these devices play an important role in initiating and propagating cascading events. Various reasons have been declared for these failures. In this project, the main objective is to develop a technique based on fuzzy to reduce blackouts during emergency conditions. The first stage of this project is power flow analysis which is used to find the input data to apply to fuzzy technic. In the second stage, fuzzy logic method is used to detect the capability of power that should be shedding from the system in case of line outage happen in the power system. The proposed fuzzy technic is tested on IEEE 5 and 30-bus system utilizing the MATLAB. The presented results versify show that by using the proposed technique various power system blackouts may be prevented.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Power electronics
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   TK7880 .A36 2012 rs Bc. 0000071441 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 6783 | TK7880 .A36 2012 rs Bc. 0000071442 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us