Dynamic timetable generator using particle swarm optimization (PSO) method / (Record no. 4447)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 01913nam a2200253 a 4500 |
| 001 - CONTROL NUMBER | |
| control field | vtls000077154 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20251114204558.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 140402t2013 my da f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
| International Standard Book Number | THE0001735(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] | |
| Level of rules in bibliographic description | 201905131215 |
| Level of effort used to assign nonsubject heading access points | yusri |
| Level of effort used to assign subject headings | 201404030757 |
| Level of effort used to assign classification | Fida |
| -- | 201404021327 |
| -- | Fida |
| 040 ## - CATALOGING SOURCE | |
| Original cataloging agency | UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | QA76.63 .T44 2013 rs Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Teh, Yung Chuen |
| 245 10 - TITLE STATEMENT | |
| Title | Dynamic timetable generator using particle swarm optimization (PSO) method / |
| Statement of responsibility, etc. | Teh Yung Chuen |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Kuantan, Pahang : |
| Name of publisher, distributor, etc. | UMP, |
| Date of publication, distribution, etc. | 2013 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | xiii, 42 p. : |
| Other physical details | ill. (some col.) ; |
| Dimensions | 30 cm. + |
| Accompanying material | 1 CD-ROM |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Project paper (Bachelor of Computer Science (Software Engineering)) -- Universiti Malaysia Pahang - 2013 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Bibliography : p. 37 |
| 520 3# - SUMMARY, ETC. | |
| Summary, etc. | This paper addresses the usage of Particle Swarm Optimization (PSO) in generating a timetable which the selection of driver and vehicle are based on the concept of PSO. The objectives are simultaneously considered as follow: 1) minimizing the cycle time, 2) regenerate the timetable. Searching for an optimal solution in such of large sized population will be time consuming and thus by presenting the PSO method is able to select the appropriate driver and vehicle with a shorter period. The timetable that is generated will be more appropriate as regenerating function can handle emergency such as breakdown of vehicle. Besides, during the generating of timetable, it also considers constraints which make the task more challenging. The chosen particle during implementing the PSO method should be chosen with fitness nearest to fifty in this system. Thus, the timetable for transport schedule system can be arranged without clashing of driver or vehicle. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Logic programming |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Swarm intelligence |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not lost | Not for loan | UMPLIB GAMBANG | UMPLIB GAMBANG | 04/09/2019 | CD 7604 | QA76.63 .T44 2013 rs Bc. | 0000078851 | 04/09/2019 | 1 | 04/09/2019 | Final Year Report | |||
| Not lost | Not for loan | UMPLIB PEKAN | UMPLIB PEKAN | 04/09/2019 | QA76.63 .T44 2013 rs Bc. | 0000078850 | 04/09/2019 | 1 | 04/09/2019 | Final Year Report |