Wind turbine ( wind mapping ) / (Record no. 4659)

MARC details
000 -LEADER
fixed length control field 02278nam a2200241 a 4500
001 - CONTROL NUMBER
control field vtls000078378
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204605.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 140521t2013 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0006420(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131512
Level of effort used to assign nonsubject heading access points amirul
Level of effort used to assign subject headings 201502101405
Level of effort used to assign classification ariffin
-- 201405211401
-- training4
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TJ828 .Z34 2013 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Zahidah Ansari
245 10 - TITLE STATEMENT
Title Wind turbine ( wind mapping ) /
Statement of responsibility, etc. Zahidah Ansari
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent viii, 62 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Mechatronics Engineering) -- Universiti Malaysia Pahang - 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibilography : p. 60-61
520 3# - SUMMARY, ETC.
Summary, etc. Wind turbine is a very good source of green energy. But building it needed a higher cost compare to other type of green energy. Therefore, choosing the right location to build the wind turbine is very important. Many cases have shown that if the location chosen is not appropriate, it will lead to pure lost since the turbine may not be able to function well. Besides that, choosing whether to build a low speed or high speed wind turbine is also important. This solely depends on the location chosen to build the turbine. Therefore the process of wind mapping is very important in the initial steps of building a wind turbine. During the wind mapping process, wind speed data of the chosen location is collected for a period of time. Usually from weeks up years. Then the sets of data are analyses, calculated and stimulated in graph. Later then when all the data have been analyses, calculated and stimulated we will know whether the location of studies is suitable or building wind turbine or not, and the type of wind turbine we should build. Later the data obtain is also used to study when is exactly the right time to use the wind turbine in its optimum condition as the wind speed varies throughout the whole year. From this we can alternate the usage of wind turbine energy and domestic electric supply. Although the effect may seem small, but we are actually minimizing energy waste due to excessive usage.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Wind turbines
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   TJ828 .Z34 2013 rs Bc. 0000080325 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 7766 | TJ828 .Z34 2013 rs Bc. 0000080326 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us