Optimize flow layout and analysis of effectiveness at bi technologies Corporation sdn. Bhd / (Record no. 4922)

MARC details
000 -LEADER
fixed length control field 01884nam a2200241 a 4500
001 - CONTROL NUMBER
control field vtls000078153
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204613.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 140509t2013 my a f m 000 | eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0007637(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905171200
Level of effort used to assign nonsubject heading access points fawwaz
-- 201405091606
-- training3
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TS178 . A35 2013 rs Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nur Afiqah Noor Azman
245 10 - TITLE STATEMENT
Title Optimize flow layout and analysis of effectiveness at bi technologies Corporation sdn. Bhd /
Statement of responsibility, etc. Nur Afiqah Noor Azman
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. a Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xv, 55 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Engineering in Manufacturing) -- Universiti Malaysia Pahang – 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 74-76
520 3# - SUMMARY, ETC.
Summary, etc. Agilent Production cell 6 fosters inefficient production practices, is outdated for its existing process, and lacking in product flow. A plant optimization is applied to bring order, efficiency, and optimize flow in the production lines. Deliverables include a proposed process and material flow that decreases product travel distances, cross flow and increases productivity as well as effectiveness of the proposed optimization analysis. Major modification of the cell decisions include downsizing the existing cell, sorting to find waste in material handling and establishing a clear process/product flows. The proposed plant optimization was analysis and results yield 100% productivity. The percentage efficiency of the optimize flow layout is 80% compared to 67% in existing flow layout. The analysis of efficiency has been increased to 13% in the proposed process flow. The product travel distance also has been reduced from 93 feet’s to 20 feet’s.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Plan Layout
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   TS178 . A35 2013 rs Bc. 0000080210 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB PEKAN UMPLIB PEKAN 04/09/2019   CD 7718 | TS178 . A35 2013 rs Bc. 0000080211 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us