MARC details
| 000 -LEADER |
| fixed length control field |
02251ntm a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000081945 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113229.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
141016t2013 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0007640(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905171202 |
| Level of effort used to assign nonsubject heading access points |
fawwaz |
| Level of effort used to assign subject headings |
201411051225 |
| Level of effort used to assign classification |
safura |
| -- |
201410161140 |
| -- |
Fida |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TS178 .L56 2013 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Lim, Tien Yong |
| 245 10 - TITLE STATEMENT |
| Title |
Productivity improvement through re-design workplace area / |
| Statement of responsibility, etc. |
Lim Tien Yong |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2013 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiii, 63 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2013 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p.47-48 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
For industrial use, ergonomics has traditionally been used to solve the injuries problem from repetitive motion, prolonged postures, and some other physical risks. However, the utility of ergonomics is not just only limited to solve the injuries problem. Good ergonomics investment also can be applied to improve productivity. This project are carried out at Sidmann Composite Sdn Bhd. The Objective of this project are propose a new workplace with ergonomics features for Sidmann Composite Sdn. Bhd. to reduce the level of musculoskeletal risks of the workplace and improve the production process’s cycle time. In order to ensure the objectives are met. A comprehensive data collection was divided into three phase, such as phase one is to perform up-front analysis, phase two is to determine the existing working process risk and operational impact, phase three is to estimate proposed working process risk and operational impact. The assessment was carried out by Rapid Entire Body Assessment (REBA) and Strain Index (SI) to assess the level of musculoskeletal risk in this company. Methods-Time Measurement (MTM) was used to determine the labor time for the performing task improvement. Finally, existing process and proposed process was compared in this project. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Plant layout |
| General subdivision |
Planning |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Industrial productivity |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Furniture industry and trade |