Structural dynamic analysis of oil and gas transmission pipe / (Record no. 5102)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02286ntm a2200241 a 4500 |
| 001 - CONTROL NUMBER | |
| control field | vtls000082820 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20251117113229.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 141103t2013 my da f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
| International Standard Book Number | THE0005735(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] | |
| Level of rules in bibliographic description | 201905221016 |
| Level of effort used to assign nonsubject heading access points | hanafiah |
| -- | 201411031207 |
| -- | Fida |
| 040 ## - CATALOGING SOURCE | |
| Original cataloging agency | UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | TA418.17 .W36 2013 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Wan, Dong Hua |
| 245 10 - TITLE STATEMENT | |
| Title | Structural dynamic analysis of oil and gas transmission pipe / |
| Statement of responsibility, etc. | Wan Dong Hua |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Kuantan, Pahang : |
| Name of publisher, distributor, etc. | UMP, |
| Date of publication, distribution, etc. | 2013 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | xvi, 46 p. : |
| Other physical details | ill. ; |
| Dimensions | 30 cm. + |
| Accompanying material | 1 CD-ROM |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Project paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang – 2013 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Bibliography : p. [47] |
| 520 3# - SUMMARY, ETC. | |
| Summary, etc. | This project was carried out as a study of structural dynamic analysis using ANSYS to simulate the system vibration. The objective of this project is to obtain dynamic characteristics of oil and gas transmission pipeline. In order to get the dynamic characteristics, the pipeline system should be designed to be used for the experiment and simulation test. Following the design system, setting the PVC material, then import the pipeline system into ANSYS to make modal analysis. Simulating the vibrate variation from 0 Hz to 600 Hz. According to the deformation of the pipeline system, to find where is the most serious deformation place. So the point what we find is the damping point, the frequency at this point is the natural frequency. Collecting all data of the natural frequency and mode shapes at the damping points. The second part is the experiment. Following the design system, assemble the entity system. Use the accelerometer sensor to convert pipeline system vibration to electrical as input data. Following the accelerometer, use the instrument driver to connect the accelerometer with the laptop. Lastly to start the experiment by the impact hammer knock the pipeline system, and then collect the data of natural frequencies, mode shapes and damping of the structural dynamic of the pipeline system. Comparing the mode shapes to select the natural frequency with the same mode shapes from the experiment and simulation. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Gas pipelines |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not lost | Not for loan | UMPLIB PEKAN | UMPLIB PEKAN | 04/09/2019 | TA418.17 .W36 2013 r Bc. | 0000086400 | 04/09/2019 | 1 | 04/09/2019 | Final Year Report | |||
| Not lost | Not for loan | UMPLIB PEKAN | UMPLIB PEKAN | 04/09/2019 | CD 8141 | TA418.17 .W36 2013 r Bc. | 0000086401 | 04/09/2019 | 1 | 04/09/2019 | Final Year Report |