The impact of multilayer subcontracting system in construction industry in Pahang / (Record no. 5219)

MARC details
000 -LEADER
fixed length control field 02791ntm a2200265 a 4500
001 - CONTROL NUMBER
control field vtls000083188
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113233.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141110t2013 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001548(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271100
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201502021048
Level of effort used to assign classification fawwaz
Level of effort used to assign subject headings 201411131331
Level of effort used to assign classification training1
-- 201411101018
-- training1
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD2381 .N37 2013 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nasyrah Fahada Abdul Razak
245 14 - TITLE STATEMENT
Title The impact of multilayer subcontracting system in construction industry in Pahang /
Statement of responsibility, etc. Nasyrah Fahada Abdul Razak
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xvi, 58 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Project Management with Honours) -- Universiti Malaysia Pahang – 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 49-52
520 3# - SUMMARY, ETC.
Summary, etc. In construction industry, there is possibility for subcontractors to sublet their work to other subcontractors. It called multilayer subcontracting. Multilayer subcontracting has been identified as a source of poor time performance of projects in previous study. This study is about the impact of multilayer subcontracting system on project performance in Malaysian construction industry. The purpose of this paper is to study how multilayer subcontracting practice impacts the project time performance. It provides a perspective that multilayer subcontract could address the poor time performance caused by multilayer subcontracting. From previous study it shows that the multilayer subcontracting practice can be divided into five areas, which are communication, cost control, labour force, worker safety and productivity. This study expecting a positive relationship between multilayer subcontracting practices and project time performance. A method of survey questionnaire is being used in order to collect the data. The questionnaire distributed to contractor with “A” class registered with local authority, Pusat Khidmat Kontraktor (PKK). There are three sections in the questionnaire; Section A: Demography; Section B: Are they practice multilayer subcontracting; Section C; Their performance in time management. 84 respondents were targeted however only 52.38% gave feedback. The collected data was analysed using Statistical Package for the Social Science. This study found that there are only two areas that have positive relationship with the time performance namely worker safety and productivity. However it shows that the contractors actively practice multilayer subcontracting in the area of labour force.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Subcontracting
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project management
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD2381 .N37 2013 r Bc. 0000090222 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8476 | HD2381 .N37 2013 r Bc. 0000090223 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us