A study on risk management key performance indicators for developing comprehensive malaysian standard risk management performance level in construction industry / (Record no. 5240)

MARC details
000 -LEADER
fixed length control field 02903ntm a2200253 a 4500
001 - CONTROL NUMBER
control field vtls000083197
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113234.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141110t2013 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001532(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271049
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201502021119
Level of effort used to assign classification fawwaz
Level of effort used to assign subject headings 201411131334
Level of effort used to assign classification training1
-- 201411101109
-- training1
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD61 .F35 2013 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Ahmad Faisal Zulkifli
245 12 - TITLE STATEMENT
Title A study on risk management key performance indicators for developing comprehensive malaysian standard risk management performance level in construction industry /
Statement of responsibility, etc. Ahmad Faisal Zulkifli
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 49 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Engineering Technology
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Project Management with Honours) -- Universiti Malaysia Pahang – 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 42-43
520 3# - SUMMARY, ETC.
Summary, etc. In managing project, manager will face risk in various situations, if risk is left unattended, a devastating impact may get on the project. In severe cases, risk not only retarded the project growth but also destroyed the project. In order to comprehend the impact of risk, project manager are using the risk management, not just that risk management also have become one of the big part in project management around the world. The importance of risk management has cause the risk management to have its own measure to establish the effectiveness performance of risk management. This research are conducted to study about risk management performance indicator and it also will give a good picture on how the key performance indicator for risk management are constructed base on the specific objective of the related department or organization. This proposed risk management indicator is suitable to be used in construction field because the research been conducted by using G7 contractor as respondent. The indicators are formulated base on the objective of implementing risk management that been extracted from previous research. After have obtained a complete list of objective it been distributed to the respondent in form of questionnaire. The feedback from the respondent will determine which the objectives are preferable to be used as indicator. The result is set of key performance indicator that can be used to evaluate risk management performance in construction industry. The indicators are formulated base on the chosen objective of implementing risk management after getting a complete list of the selected objective from the distributed questionnaire. Therefore, having this indicator can make the evaluation process of risk management performance easier and the benchmark in standardize order.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Risk management
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD61 .F35 2013 r Bc. 0000090208 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8469 | HD61 .F35 2013 r Bc. 0000090209 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us