Industrial gas piping system for chemical engineering laboratory Universiti Malaysia Pahang / (Record no. 5257)

MARC details
000 -LEADER
fixed length control field 04819ntm a2200277 a 4500
001 - CONTROL NUMBER
control field vtls000083428
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113235.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141113t2013 my a f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0003537(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905152018
Level of effort used to assign nonsubject heading access points zulaiha
Level of effort used to assign subject headings 201411241004
Level of effort used to assign classification Fida
-- 201411131521
-- ariffin
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TH6830 .R67 2013 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Rosmimie Abdullah
245 10 - TITLE STATEMENT
Title Industrial gas piping system for chemical engineering laboratory Universiti Malaysia Pahang /
Statement of responsibility, etc. Rosmimie Abdullah
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 84p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Chemical Engineering (Gas Technology) -- Universiti Malaysia Pahang – 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 55-56
520 3# - SUMMARY, ETC.
Summary, etc. Industrial gas piping system for Faculty of Chemical and Natural Resources Engineering (FKKSA) laboratory is used to supply industrial gas to the equipments in clean room laboratory. The gases that are supplied to the laboratory are Nitrogen (N2), Carbon Dioxide (CO2), Oxygen (O2), Hydrogen (H2), Helium (He), Compressed Air, Nitrous Oxide (N2O), Acetylene (Ace) and Argon (Ar). These gases are used for specific equipment such as fermenter, gas chromatography (GC), and Atomic Absorption Spectroscopy (AAS).These equipments are used for research and training. The piping systems are generally stainless steel tubing with 3/8 inch and 1/4 inch tube outside diameters. There are five rooms in the cleanroom laboratory that involved with piping system, and they are BioTech Analytical Laboratory, BioTech Animal & Plant Cell Culture Room, BioTech Processing Scale Up Laboratory 1, BioTech Processing Scale Up Laboratory 2, Analytical Hot Laboratory, and Analytical Cool Laboratory. Generally, part of this piping system has already stopped from operating because of suspected leakage occurring in the system. This leakage can contribute to the economic loses as the gas escaped to the surrounding continuously. As small quantity of gases escape will greatly affect the cost (F. J. Callahan, 1993). There are cases where gases are supplied directly from cylinder to the equipment without a proper piping system. This is not complying with MS 830 clause 11.3 “the cylinder shall not be stored in a building or part thereof or structures attached thereto when the building is used as an educational institution”. The consequence from this non-compliance may cause the possibilities of inhaled gases by the public and lead to suffocation from the accumulation of flammable or reactive gases. In order to solve the problem, leak test should be conducted. However, this is not simple. It should be done with correct procedure by referring to appropriate standard. Similar goes to the cylinder storage area, it does not have enough signage as stated by MS 830 clause 10.7 “the messages in the form of signs shall be clearly displayed at the storage area”. The warning notice shall be in letters of at least 50mm high. Thus, this research is aim to identify the safety of the existing industrial gas piping system at selected laboratory and also to improve the existing system based on acceptable standards. Basically in this research, it involves site surveying, measurement, collecting data, discussion and documentation. Start with measuring the length of piping in selected room using measuring tape as the original drawing of the system was missing. Then, the drawing of the system is done by using AutoCAD. Next is to calculate the number of cylinder needed for the leak test for the piping system. After the calculation, the cost of leak test was estimated. Then, step by step procedure to conduct leak test are performed according to ASME B31.3. This procedure can be a reference to laboratory owners who want to conduct leak test in the future. The analysis of the safety in for the system is also carried out. From calculation, it shows that the volume of gas needed for test is 34281 ft3 at atmospheric pressure which is equal to 228 ft3 at 2200 psig. From this volume, supply pressure can be calculated and for all piping, the supply pressure calculated is generally higher than test pressure. Thus, only one cylinder is needed for all piping system. For safety analysis, it showed that eighteen items is complying with standards and ten items is not complying with the standards. This should be improved so that the system is safe to be used in the laboratory.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Gas-fitting
General subdivision Safety measures
-- Standards
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Gas pipelines
General subdivision Safety measures
-- Standards
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Gas-pipes
General subdivision Safety measures
-- Standards
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Ventilation
General subdivision Safety measures
-- Standards
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   TH6830 .R67 2013 r Bc. 0000087075 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8322 | TH6830 .R67 2013 r Bc. 0000087076 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us