Principles of sequencing and scheduling / (Record no. 53320)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 01616nam a2200253 a 4500 |
| 001 - CONTROL NUMBER | |
| control field | vtls000044076 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20251117150205.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 090914t2009 njua f b 001 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
| International Standard Book Number | 9780470391655 |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
| International Standard Book Number | 0470391650 |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] | |
| Level of rules in bibliographic description | 201107132341 |
| Level of effort used to assign nonsubject heading access points | VLOAD |
| Level of effort used to assign subject headings | 201008051437 |
| Level of effort used to assign classification | jamie |
| -- | 200909141131 |
| -- | nadia |
| 040 ## - CATALOGING SOURCE | |
| Original cataloging agency | UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | TS157.5 .B35 2009 |
| 100 1# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Baker, Kenneth R. |
| 245 10 - TITLE STATEMENT | |
| Title | Principles of sequencing and scheduling / |
| Statement of responsibility, etc. | Kenneth R. Baker, Dan Trietsch |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Hoboken, N.J. : |
| Name of publisher, distributor, etc. | John Wiley, |
| Date of publication, distribution, etc. | c2009 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | xv, 493 p. : |
| Other physical details | ill. ; |
| Dimensions | 25 cm. |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Includes bibliographical references and indeX |
| 505 0# - FORMATTED CONTENTS NOTE | |
| Formatted contents note | Introduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Production scheduling |
| 700 1# - ADDED ENTRY--PERSONAL NAME | |
| Personal name | Trietsch, Dan. |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Date acquired | Cost, normal purchase price | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Cost, replacement price | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not lost | UMPLIB GAMBANG | UMPLIB GAMBANG | 04/09/2019 | 380.43 | TS157.5 .B35 2009 | 0000048910 | 04/09/2019 | 1 | 380.43 | 04/09/2019 | Open Shelf |