MARC details
| 000 -LEADER |
| fixed length control field |
02551ntm a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000085135 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113242.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
150130t2013 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0003487(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905151204 |
| Level of effort used to assign nonsubject heading access points |
irma |
| Level of effort used to assign subject headings |
201501301601 |
| Level of effort used to assign classification |
fawwaz |
| -- |
201501301219 |
| -- |
fawwaz |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TH438.4 .Y37 2013 r Bc. |
| 100 3# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Yap, Qing Fu |
| 245 12 - TITLE STATEMENT |
| Title |
A study on the causes and methods to prevent construction delay in Selangor state and Kuala Lumpur / |
| Statement of responsibility, etc. |
Yap Qing Fu |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2013 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
vii, 61 p. : |
| Other physical details |
ill. ; |
| Dimensions |
30 cm. |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Civil Engineering and Earth Resources |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Engineering (Civil Engineering)) -- Universiti Malaysia Pahang – 2013 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 53-56 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Construction delays are one of the biggest problems construction industries face, it will directly affect the parties involved in the contract, contribute to cost and time overruns, litigation and late in project transfer to owner. Therefore, in order to reduce and prevent delay in construction, it is important to determine the real causes of construction delay. The main objectives of this study are to identify the causes and methods to prevent construction delay in Selangor state and Kuala Lumpur. This study was carried out by conducting literature review and questionnaire survey. There are 29 causes and 15 methods to prevent construction delays have been identified in literature review state and the causes of construction delays have been grouped into eight major groups. The survey questionnaires were distributed to the developer, consultant and contractor in Selangor state and Kuala Lumpur. The main objectives in this research have been achieved. The major group of delays which contributes the most in the construction delays is contractor related delays. The top five causes of delays are unforeseen site condition, finance and payments of completed work, site management, delays caused by subcontractor, improper planning and errors during construction. While the top five methods to prevent construction delays are frequent progress meeting, effective strategic planning, frequent coordination between the parties involved, proper project planning and scheduling and collaborative working in construction |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Construction contracts |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Production scheduling |