Project crashing in construction industry: (Record no. 5560)

MARC details
000 -LEADER
fixed length control field 01897ntm a2200241 a 4500
001 - CONTROL NUMBER
control field vtls000083135
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113244.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141105t2013 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001543(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271055
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201411131331
Level of effort used to assign classification training2
Level of effort used to assign subject headings 201411131330
Level of effort used to assign classification training2
Level of effort used to assign subject headings 201411051737
Level of effort used to assign classification training2
-- 201411051559
-- training2
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD69.P75 R43 2013 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Muhammad Redho Mardzuki
245 10 - TITLE STATEMENT
Title Project crashing in construction industry:
Remainder of title investigation of the strategies, challenges and impacts /
Statement of responsibility, etc. Muhammad Redho Mardzuki
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xvii, 78 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor of Project Management with Honors) -- Universiti Malaysia Pahang – 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 79-82
520 3# - SUMMARY, ETC.
Summary, etc. This survey is conducted to study the project crashing in the aspect of the strategies and challenges in construction industry. Besides, this study also identified the impacts on cost, time and quality once the strategies are being implemented. The objectives of this study were to identify the strategies that can crash a project successfully, to identify the challenges in project crashing and to examine the relationship between the strategies used in project crashing and the impacts in terms of cost, time and quality. The data are obtained mainly from the primary data which is the survey questionnaires. Total sample of 54 respondents were used in this study. The result of this study has identified the suitable strategies to crash a project, the challenges faced in project crashing and also see the impact of the strategies used in terms of cost, time and quality.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Indurstrial management
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD69.P75 R43 2013 r Bc. 0000090194 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8462 | HD69.P75 R43 2013 r Bc. 0000090195 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us