Scheduling claim analysis: (Record no. 5561)

MARC details
000 -LEADER
fixed length control field 03812ntm a2200253 a 4500
001 - CONTROL NUMBER
control field vtls000083142
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113244.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141105t2014 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001571(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271124
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201712061136
Level of effort used to assign classification huda
Level of effort used to assign subject headings 201411131332
Level of effort used to assign classification training2
-- 201411051613
-- training2
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD9715.8 .Z34 2014 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Zahidah Jahidi
245 10 - TITLE STATEMENT
Title Scheduling claim analysis:
Remainder of title a comprehensive schedule related claims of contract administration for construction industry /
Statement of responsibility, etc. Zahidah Jahidi
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2014
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 66 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor of Project Management with Honors) -- Universiti Malaysia Pahang – 2014
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 67-71
520 3# - SUMMARY, ETC.
Summary, etc. As the construction industry rapidly grows in Malaysia and contributes to our nation’s economic growth, it plays a very important role in the development of our country. The accuracy and completion of the project schedule is important to the early and successful resolution of the schedule delay claim issues. In advance, the causes that contribute to the schedule related claims need to be identified as it will be very helpful in the resolution process from the bottom of the issue. Besides, the adjustment or delay on project schedule that might causes delay claims need to be highlighted by the scheduling practitioners. As this research will study the scheduling claims from the different points of view of project parties (contractors and clients), the questionnaires are extremely critical components as the instrument for this research process. In addition, the data analysis was conducted accordingly from the process of identifying and notifying the contract claims, followed by the determination of the causes of schedule related contract claims and lastly the determination of key elements for a strong schedule related contract claims. The outcomes of this research show that the delays in construction and completion of the contract itself is the main causes that usually lead to a schedule related construction claims. This may due to the incomplete contract, which is the main thing as an agreement in the project. The potential causes to the schedule related contract claims identified in this research are ranked as; 1.Delays in construction and completion of the contract, 2.Incomplete and defective work, and 3.Abnormal or unusual weather conditions. Identify and rank the key elements for a strong schedule related contract claims is the second objective for this research to be conducted. These elements are important in order to obtain a clear and good claim as it is the characteristics that need to be considered and implemented in constructing a schedule related contract claims. The data analyzed find out that the outmost key element that need to be implemented in a strong schedule related contract claims is reviewing and understanding the contract itself in order to determine whether the contract allows for an extension of time and compensation. It means a clear understanding regarding the project’s contract will definitely makes a contract claims stronger. While the other key elements identified are ranked as; 1.Review and understand the contract to determine whether the contract allows for an extension of time and compensation, 2.Notice (either actual or constructive) of the delay must be given, and 3.Determination of the critical path is often required for the calculation of delay damages.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction industry
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/18274/">http://ecollib.ump.edu.my/18274/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD9715.8 .Z34 2014 r Bc. 0000090196 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8463 | HD9715.8 .Z34 2014 r Bc. 0000090197 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us