Effect of managing technical risk towards reducing cost of production in project / (Record no. 5585)

MARC details
000 -LEADER
fixed length control field 02636ntm a2200253 a 4500
001 - CONTROL NUMBER
control field vtls000083149
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113245.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141105t2014 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001540(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271053
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201712041143
Level of effort used to assign classification huda
Level of effort used to assign subject headings 201411131333
Level of effort used to assign classification training2
-- 201411051635
-- training2
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD69.P75 A44 2014 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Mohd Amerul Amin Razali
245 10 - TITLE STATEMENT
Title Effect of managing technical risk towards reducing cost of production in project /
Statement of responsibility, etc. Mohd Amerul Amin Razali
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2014
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 84 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelor of Project Management with Honors) -- Universiti Malaysia Pahang – 2014
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 85-94
520 3# - SUMMARY, ETC.
Summary, etc. In world life today, there are always risks. In a project, the risk will become the strongest obstacle to ensure the project is successful which means it meets the goal without affecting the cost. Risks that appear in projects will affect the cost directly and usually will result in cost overrun. This study focuses on the cost for production which is also an important factor to be managed in a project. This study aims to reduce the production cost for project without affecting the scope and quality of the project. A company is impossible to reduce the cost through cutting in the material being used because it can directly affect the quality. Therefore, the objective of this study is to find whether by managing technical risks according to project phases, the production cost can be reduced. Statistical Package for Social Science (SPSS) software has been used to find the linear regression and Pearson correlation of the questionnaire imposed. The outcome shows that in execution phase, wrong in cost estimation risk is the most important to be managed to reduce the cost, while in planning phase, the environmental risk and operation risk are the most important to be managed to reduce the cost. In future, it is suggested that a comparison is made between two or more company in getting more accurate result and in analyzing the exact value for cost in a sample project. As the conclusion, project managers should focus to manage those risks that have strong relationship to ensure that they can reduce the cost of production in order to maintain the project scope and quality.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Project management
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/18304/">http://ecollib.ump.edu.my/18304/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD69.P75 A44 2014 r Bc. 0000090198 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8464 | HD69.P75 A44 2014 r Bc. 0000090199 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us