MARC details
| 000 -LEADER |
| fixed length control field |
02442ntm a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000083139 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113245.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
141105t2013 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0001509(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905271024 |
| Level of effort used to assign nonsubject heading access points |
asmadi |
| Level of effort used to assign subject headings |
201411131314 |
| Level of effort used to assign classification |
training1 |
| -- |
201411051612 |
| -- |
training1 |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
HD30.3 .N35 2013 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Najib Md Saad |
| 245 10 - TITLE STATEMENT |
| Title |
Mathematical model to reduce the lead time at workstations / |
| Statement of responsibility, etc. |
Najib Md Saad |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2013 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xii, 49 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project Paper (Bachelors of Project Management with Honours) -- Universiti Malaysia Pahang – 2013 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 44-46 |
| 520 ## - SUMMARY, ETC. |
| Summary, etc. |
In the modern’s era, the efficiency in workstations assembly line (AL) of manufacturing industry is very crucial and important in dealing with the customers and market demand. In addition, the automotive industry is one of the most important industries in the world nowadays. The automotive manufacturing industries have many shops and workstations. Each workstation has a number of operations including tasks that delegated. The operations and task is depend on the assemble product on body car. One of these shops is Assembly line shop. The scope of this study is focusing on the Assembly Line Shop (ALS) in the Automotive Assembly Line. The problems that occur in the assembly line shop concern queuing and idle time that will directly affect to the lead time between workstations. In this study, it discusses about to minimize the lead time at assembly line and to maximize the process time at workstations by using mathematical model. A mathematical model was applied to maximize the process time all operations in all workstations at the same time and to reduce the lead time in transferring the car structure and part between stations during assemble. The result showed that saving time and ensuring maximum production can increase profits in the automobile manufacturing industry. The time frame covered is one year it is in the year of 2013. This study is conducted by using the mathematical model and using MATLAB software to solve it. |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Communication in management |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Leadership |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Torque |
| General subdivision |
Mathematical models |