A study of causes and effects of conflict in construction industry / (Record no. 5632)

MARC details
000 -LEADER
fixed length control field 03005ntm a2200241 a 4500
001 - CONTROL NUMBER
control field vtls000083167
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113246.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141105t2013 my da f m 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001518(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271040
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201411131318
Level of effort used to assign classification training1
Level of effort used to assign subject headings 201411051733
Level of effort used to assign classification training1
-- 201411051731
-- training1
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD42 .L65 2013 r Bc.
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Loke, Yi San
245 12 - TITLE STATEMENT
Title A study of causes and effects of conflict in construction industry /
Statement of responsibility, etc. Loke Yi San
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2013
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 116 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Project Management with Honours) -- Universiti Malaysia Pahang – 2013
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 99-110
520 3# - SUMMARY, ETC.
Summary, etc. Nowadays, conflict seems like common and inevitable in the construction industry. Construction industry is a larger project which is complex since it involves variety of parties who are related to the project. Due to the multidisciplinary of the project participants, conflict becomes unavoidable issue in the construction industries. Internal conflicts that commonly involved the parties that directly participate in the project such as project developers, project consultants, and project contractors. Internal conflict can break the relationship among the participants, affect the work quality and productivity, and may lead to project fail if it is not manage in well. Thus, this research aim to identify the causes and effects that lead to internal conflict among three categories of the respondents, which are Developer, Contractor and Consultant. The survey questionnaire had been used in collecting the data from 134 of the respondents. The literature review in this study highlighted 4 main causes such as Contractual problems, Design/scope related problems, Management problems and Behavioural problems; and 4 main effects which are Time, Cost, Productivity and Quality, and Organization and its reputation related effects. Based on the analysis result from the collected data, the 4 most significant causes are Error and Omission in Project Design, Ambiguities in Contract Documents, Error and Omissions in the Contract Terms and Improper Planning and Scheduling, whereas most significant effects of internal conflict are Delay in Project Duration, Lost of Profitability, and Project Cost Overruns. Besides this, the Pearson Correlation Coefficient Analysis and Spearman Rank Correlation Analysis had been used to test the strength of relationship between causes and effects of internal conflict, and test the degree of agreement between 3 categories of respondents to the causes and effects. In overall, the correlation between causes and effects shown moderate positive in relationship, and there is no same agreement among that 3 categories of respondents.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Conflict management
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD42 .L65 2013 r Bc. 0000090192 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8461 | HD42 .L65 2013 r Bc. 0000090193 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us