MARC details
| 000 -LEADER |
| fixed length control field |
01888ntm a2200241 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000083372 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113247.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
141112t2013 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0003782(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905151453 |
| Level of effort used to assign nonsubject heading access points |
shah |
| Level of effort used to assign subject headings |
201411261300 |
| Level of effort used to assign classification |
fawwaz |
| Level of effort used to assign subject headings |
201411141245 |
| Level of effort used to assign classification |
fawwaz |
| -- |
201411121618 |
| -- |
fawwaz |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
TP156.A3 F37 2013 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Mohd Faridhwan Mohamad Zulkapli |
| 245 10 - TITLE STATEMENT |
| Title |
Dynamic model of co2 removal using aspen hysys / |
| Statement of responsibility, etc. |
Mohd Faridhwan Mohamad Zulkapli |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2013 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xv, 77 p. : |
| Other physical details |
ill. ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Chemical Engineering) -- Universiti Malaysia Pahang - 2013 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 77 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
The objective if this study is to stimulate CO2 removal process by using Aspen HYSYS. The methodology of this study is divided into two phase. The first phase relates to the model development of steady state and the second phase related to dynamic simulation. In the first phase, the design data are collected from an industry. The simulation results are then compared to the available design data. The second phase basically involves equipment sizing that should be conducted before the dynamic modeling is developed. Validation of dynamic model and real plant data is considered based on normal condition. The abnormal simulation is then conducted by introducing disturbances and or faults in the process. As the conclusion, this simulation can be used as training and learning tools for engineers and operator, to understand the dynamic characteristic of CO2 removal process and also be able to use the simulation to improved performance of the CO2 removal process |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Carbon dioxide |