Experimental analysis on water pipe turbine-generator design parameters / (Record no. 5817)
[ view plain ]
| 000 -LEADER | |
|---|---|
| fixed length control field | 02345ntm a2200253 a 4500 |
| 001 - CONTROL NUMBER | |
| control field | vtls000083975 |
| 003 - CONTROL NUMBER IDENTIFIER | |
| control field | KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION | |
| control field | 20251117113252.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION | |
| fixed length control field | 141124t2013 my a f m 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER | |
| International Standard Book Number | THE0005793(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] | |
| Level of rules in bibliographic description | 201905131414 |
| Level of effort used to assign nonsubject heading access points | aida |
| -- | 201411241048 |
| -- | fawwaz |
| 040 ## - CATALOGING SOURCE | |
| Original cataloging agency | UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) | |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) | TA418.72 .A46 2013 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME | |
| Personal name | Nurulamni Md Mukhtar |
| 245 10 - TITLE STATEMENT | |
| Title | Experimental analysis on water pipe turbine-generator design parameters / |
| Statement of responsibility, etc. | Nurulamni Md Mukhtar |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. | |
| Place of publication, distribution, etc. | Kuantan, Pahang : |
| Name of publisher, distributor, etc. | UMP, |
| Date of publication, distribution, etc. | 2013 |
| 300 ## - PHYSICAL DESCRIPTION | |
| Extent | xv, 51 p. : |
| Other physical details | ill. ; |
| Dimensions | 30 cm. + |
| Accompanying material | 1 CD-ROM |
| 502 ## - DISSERTATION NOTE | |
| Dissertation note | Project paper (Bachelor of Mechanical Engineering) -- Universiti Malaysia Pahang - 2013 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE | |
| Bibliography, etc. note | Bibliography : p. 50 |
| 520 3# - SUMMARY, ETC. | |
| Summary, etc. | The objective of the study is to develop a small-scale water pump based test bed and to do prototyping of various turbine designs based on various parameters. As the energy demand of industry grows exponentially, fabrication of hydraulic energy system becomes a crucial point of concern. Many research activities about hydraulic have been carried out by experimental methods and by theory and simulation. Hydro energy parameters have been used to study the relation between the hydro energy parameters and subsequent relative output energy. The results obtained by the experimental results, performed in prototype model. In this work different parameters have been used to tap water. The water injected by nozzle on blades of hydraulic turbines. Efficiency and maximal power output are two of the most important goals to analyze in hydraulic turbines. The efficiency of water turbines are most frequently expressed using the power output at the alternator. To perform the calculation of efficiency is necessary to know several parameters such as kinetic and potential energy of water due to the position, because of this is required to know the flow rate entering the turbine. The flow rate of water through the turbine (Q) is determined by the volume of water flowing in time unit. As a conclusion, this project is quite successful because it is able to fulfill all of the objectives stated and also performing up to expectation |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Water-pipes |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM | |
| Topical term or geographic name entry element | Water-pipes |
| General subdivision | Hydrodynamics |
| Withdrawn status | Lost status | Damaged status | Not for loan | Home library | Current library | Date acquired | Total checkouts | Full call number | Barcode | Date last seen | Copy number | Price effective from | Koha item type |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Not lost | Not for loan | UMPLIB PEKAN | UMPLIB PEKAN | 04/09/2019 | TA418.72 .A46 2013 r Bc. | 0000086266 | 04/09/2019 | 1 | 04/09/2019 | Final Year Report | |||
| Not lost | Not for loan | UMPLIB PEKAN | UMPLIB PEKAN | 04/09/2019 | CD 8074 | TA418.72 .A46 2013 r Bc. | 0000086267 | 04/09/2019 | 1 | 04/09/2019 | Final Year Report |