MARC details
| 000 -LEADER |
| fixed length control field |
02613ntm a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000091175 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113259.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
150908t2014 my da f abm 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0001550(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905271102 |
| Level of effort used to assign nonsubject heading access points |
asmadi |
| Level of effort used to assign subject headings |
201712041034 |
| Level of effort used to assign classification |
fateeha |
| -- |
201509081240 |
| -- |
asma |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
HD3871 .T36 2014 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Tan, Kwai Loon |
| 245 10 - TITLE STATEMENT |
| Title |
Contractors perspective of preferred risk allocation in public-private partnership (PPP) project in Pahang / |
| Statement of responsibility, etc. |
Tan Kwai Loon |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2014 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiii, 84 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 56-61 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Public private partnership (PPP) procurement was introduced into Malaysia through the Ninth Malaysia Plan in March 2006. PPP capable to transfer risk away from public sector to private sector. Therefore, it is important for the public and private parties to understand the risks through the whole project lifecycle prior the risk allocation agreement is made. This study aims to identify the critical risk factors of PPP projects in Pahang and to examine the preferred risk allocations for PPP projects in Pahang. Data were collected by using a set of survey questionnaire among the contractors (one representative) in each company in Grade 7 of Construction Industry Development Board (CIDB) in Pahang. Results from the study indicated that top five risk factors in Pahang are: construction time delay”, “land acquisition”, “delay in project approvals and permits”, “design deficiency” and “inflation rate volatility”. Lastly, on risk allocation preferences, this study indicated that 7 risks out of 46 risks would be preferably allocated to the public sector while 25 risks could be assigned to private sector. 11 risks were preferred to be shared by both public and private parties and the remaining of 3 risks depended on project circumstances. The results provided sufficient insight and understanding into the process of PPP as well as look deeply into the critical risks associate in the PPP projects and the contractors’ preferred risk allocation for ensuring success of PPP projects |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Public-private sector cooperation |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/id/eprint/18430">http://ecollib.ump.edu.my/id/eprint/18430</a> |
| Public note |
Access in library only |