A study on the relationship between morale of employees and project performance in the consrtuction industry in Kedah / (Record no. 6036)

MARC details
000 -LEADER
fixed length control field 03013ntm a2200277 a 4500
001 - CONTROL NUMBER
control field vtls000091258
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113300.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 150918t2014 my da f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001639(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905131133
Level of effort used to assign nonsubject heading access points yusri
Level of effort used to assign subject headings 201711301640
Level of effort used to assign classification huda
-- 201509181107
-- asma
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HF5549.5.M6 F33 2014 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Fadhilah Ahmad
245 12 - TITLE STATEMENT
Title A study on the relationship between morale of employees and project performance in the consrtuction industry in Kedah /
Statement of responsibility, etc. Fadhilah Ahmad
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2014
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 72 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 55-57
520 3# - SUMMARY, ETC.
Summary, etc. This thesis was conducted to determine the relationship between morale of employees and project performance in the construction industry. Based on a study conducted by the American Management Association study reported that among firms applying job cuts in the 1990s, 69 percent reported a decline in employee morale. This shows that morale of employees is one of important factor in the companies and organization; they should focus more on this factor to ensure best in project performance. The literature review is about the information for each variable that are used in this study, which are job satisfaction, Esprit de Corps and motivation as an independent variable. For dependent variable it would explain the information about time performance and quality performance. Besides that, this study using Krejcie & Morgan (1970) table to calculate the sample size and 44 contractors’ from Grade 4 (G4) in Kota Setar, Kedah had been chosen as respondent of this study. In methodology, this research used quantitative method and questionnaire as a main instrument to collect the data. These questionnaires consist of three sections which are section A: Demographic, section B: Morale of employees and section C: Project performance. The data that are collected from the questionnaire will be analyzed by using Statistical Package for the Social Science (SPPS) database software. Descriptive analysis, reliability analysis, ranking analysis, Pearson correlation analysis, regression analysis and analysis of hypothesis were used in the data analysis. Ranking analysis show that motivation is the higher rankings that lead to project performance and follow by job satisfaction and Esprit de Corps. From the data obtained from multiple regression analysis, all hypotheses are accepted. In conclusion, there is a positive relationship between morale of employees and project performance
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Employee morale
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Employee empowerment
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/18817/">http://ecollib.ump.edu.my/18817/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HF5549.5.M6 F33 2014 r Bc. 0000100703 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Final Processing UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8996 | HF5549.5.M6 F33 2014 r Bc. 0000100704 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us