A study of risk management in construction procurement project / (Record no. 6083)

MARC details
000 -LEADER
fixed length control field 02676ntm a2200265 a 4500
001 - CONTROL NUMBER
control field vtls000091169
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113301.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 150907t2014 my da f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001537(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271051
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201712061008
Level of effort used to assign classification huda
-- 201509071602
-- asma
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD61 .R69 2014 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Rozma Muhamad Ridzwan
245 10 - TITLE STATEMENT
Title A study of risk management in construction procurement project /
Statement of responsibility, etc. Rozma Muhamad Ridzwan
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2014
300 ## - PHYSICAL DESCRIPTION
Extent xiii, 77 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 67-69
520 3# - SUMMARY, ETC.
Summary, etc. Construction is well known as a high-risk project as it involves in lot of uncertainty at which it must be carefully managed. In risk management it is contractor’s job to take the risk or to avoid the risk in their construction project. Some of them also may take some action in order to reduce the risk in their construction project. In construction project we always heard about the project is over schedule, project over budget, low quality of project, problems with the tender, problem with the client, problem with the sub-contractor and etc. Hence, this research is to study the possible risk in construction project, to determine the level of awareness of the procurement risk among contractor in construction project and lastly to identify the tools and technique used in managing risk of construction procurement process. This method of research is both qualitative and quantitative based. A questionnaire survey and interview was conducted to collect data from contractor Grade 1. Questionnaire surveys were distributed to 118 respondents from construction firms in Pasir Puteh area and three Grade 1 contractors was interviewed. The data collected is calculated using the percentage analysis. The result shown that financial, management, time and technical are the risk that involved in construction and the level of awareness of risk among the contractors are high. The contractors also have their own tools and technique in managing risk in construction procurement. In conclusion, the risk in construction is not a small issues in construction and the contractor must take quick action in managing the risk in construction
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Risk management
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/9657/">http://ecollib.ump.edu.my/9657/</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD61 .R69 2014 r Bc. 0000100763 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 9026 | HD61 .R69 2014 r Bc. 0000100764 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us