MARC details
| 000 -LEADER |
| fixed length control field |
03389ntm a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000091235 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113302.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
150915t2014 my da f abm 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0001516(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905271040 |
| Level of effort used to assign nonsubject heading access points |
asmadi |
| Level of effort used to assign subject headings |
201712061059 |
| Level of effort used to assign classification |
huda |
| Level of effort used to assign subject headings |
201509151243 |
| Level of effort used to assign classification |
asma |
| -- |
201509151243 |
| -- |
asma |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
HD39.5 .T46 2014 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Teon, Mai Ling |
| 245 10 - TITLE STATEMENT |
| Title |
Project procurement method : |
| Remainder of title |
the conflicts in construction projects procured under design and build method / |
| Statement of responsibility, etc. |
Teon Mai Ling |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2014 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xiv, 84 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 64-67 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Design and build procurement method is one of the procurement methods where the contractor is responsible to carry out both the design and construction work of the project. Design and build contract give convenience to the client by combining project cost, schedule, design and quality into one single point of responsibility. Even though, design and build contract give many benefits to contractor and client but there are contractors and clients who still feel less excited with the benefits offered. The number of projects procured under design and build method are also decreasing in recent years. Therefore, this research purpose is to identify the conflicts in design and build construction project and propose the solution to overcome the conflicts in design and build contract. A research questionnaire was designed and distributed to 92 grade 7 contractors in Pahang state. The data obtained from respondents were analyzed using mean value analysis. The result of the survey indicated that five mostly occurred conflicts in design and build projects are variation order, delay in work activities, client delay (lack of payment), client lack interaction with contractor and time overrun or project delay. By referring to the literature review, contract form (Standard Form of Design and Build Contract – PWD Form DB (Rev.1/2010), Standard Form of Contract Be Used Where Drawings and Specifications Form Part of the Contract – PWD Form 203 (Rev. 1/2010) and Agreement and Conditions of PAM Contract 2006 with Quantities and interview with two experts from Perbadanan Kemajuan Negeri Pahang (PKNP) which are an engineer and an quantity surveyor, five solution flowcharts was proposed to overcome the five mostly occur conflicts in design and build projects. The result of this research will help the construction team, design team and client of design and build projects to systematically and effectively manage their conflicts and indirectly will help them in maintaining their good relationship. In the future study, it is proposed for the future researcher to increase the number of respondent by expanding the scope of study. When the scope of study is bigger, the researcher can know the various types of conflicts and propose a more accurate solution to overcome the conflicts |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Industrial procurement |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/18473/">http://ecollib.ump.edu.my/18473/</a> |
| Public note |
Access in library only |