MARC details
| 000 -LEADER |
| fixed length control field |
02350ntm a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000091245 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113304.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
150915t2014 my da f abm 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0001520(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905271042 |
| Level of effort used to assign nonsubject heading access points |
asmadi |
| Level of effort used to assign subject headings |
201712041031 |
| Level of effort used to assign classification |
fateeha |
| -- |
201509151551 |
| -- |
asma |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
HD47.4 .N47 2014 r Bc. |
| 100 1# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Ng, Shi Cia |
| 245 14 - TITLE STATEMENT |
| Title |
The contribution of earned value analysis for cost controlling of construction projects / |
| Statement of responsibility, etc. |
Ng Shi Cia |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2014 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xii, 89 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 63-67 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
Earned Value Analysis (EVA) is a project performance measurement technique. Managers can manage the performance of project by comparing the planned value to actual results. It allows the calculation of cost variance, performance indices and forecast the project cost performance. Therefore, EVA is very important to monitor and control the performance of the construction project. This research is using descriptive study. The purpose of this study is conducted to study the relationship between the EVA and the cost performance of the construction project. Furthermore, the aim of this study also needs to determine the effect of the EVA in the construction project. In this study, survey research will be chosen to collect the data. In order to do the survey research, questionnaire will be chosen as a quantitative method approach. There are 100 companies located in Negeri Sembilan and the sample needed is 80 companies. The results of respondent rates are 38 out of 80 companies. The results have shown that there is a positive correlation between the EVA and the cost performance of the construction project. The result of average mean also indicate that the EVA has successfully to assist the project cost within the budget is the highest mean value among the seven effects of the EVA |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Cost effectiveness |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/id/eprint/18794">http://ecollib.ump.edu.my/id/eprint/18794</a> |
| Public note |
Access in library only |