The fundamental principle of material management to control waste at site / (Record no. 618)

MARC details
000 -LEADER
fixed length control field 02015nam a2200253 a 4500
001 - CONTROL NUMBER
control field vtls000029418
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204345.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 080611t2006 my a f m 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0005005(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905140904
Level of effort used to assign nonsubject heading access points SHAHRILJ
Level of effort used to assign subject headings 201211021613
Level of effort used to assign classification Fida
Level of effort used to assign subject headings 201107132024
Level of effort used to assign classification VLOAD
Level of effort used to assign subject headings 201011091818
Level of effort used to assign classification ida
-- 200806111605
-- fara
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) TS161 .M64 2006 rs Thesis
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Mohd Fahmi Pathil
245 14 - TITLE STATEMENT
Title The fundamental principle of material management to control waste at site /
Statement of responsibility, etc. Mohd Fahmi bin Pathil
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. KUKTEM,
Date of publication, distribution, etc. 2006
300 ## - PHYSICAL DESCRIPTION
Extent xii, 94 p. :
Other physical details ill. ;
Dimensions 30 cm.
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Civil Engineering) -- Kolej Universiti Kejuruteraan dan Teknologi Malaysia - 2006
520 3# - SUMMARY, ETC.
Summary, etc. Many projects experience problems in managmg materials from wasted In addition managing material from wasted is crucial to ensure the projects are not over budgeted. The purpose of the study is to reviews the factors that can lead to material wastage and effective ways to overcome it. Questionnaire survey has been conducted to the contractor as the respondent to gain information of the practice situation in construction project. Results of the survey indicate that contractor agreed that critical factors contribute to material wastage are improper storage, wastage cause by labors, and poor wastage management. For the managing the wastage, there are four main ways and there are quality and quantity inspections, preventing material lost by good storing, careful unloading to prevent damage, and record material uses. It is hoped that these findings will guide efforts to improve the performance of the construction industry; hence a better ways in managing the materials from wasted can be generate. -Author
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Materials management
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Waste disposal in the ground
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Waste disposal sites
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   TS161 .M64 2006 rs Thesis 0000030284 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us