The implementation of Analytical Hierarchy Process (AHP) in risk assessment and its limitation in construction in Pahang / (Record no. 6369)

MARC details
000 -LEADER
fixed length control field 03659ntm a2200277 a 4500
001 - CONTROL NUMBER
control field vtls000091251
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113312.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 150917t2014 my da f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001536(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271051
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201711281523
Level of effort used to assign classification saini
-- 201509171529
-- asma
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD61 .N49 2014 r Bc.
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Ng, Wei Jian
245 14 - TITLE STATEMENT
Title The implementation of Analytical Hierarchy Process (AHP) in risk assessment and its limitation in construction in Pahang /
Statement of responsibility, etc. Ng Wei Jian
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2014
300 ## - PHYSICAL DESCRIPTION
Extent xii, 85 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD-ROM
500 ## - GENERAL NOTE
General note Faculty of Industrial Management
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 70-74
520 3# - SUMMARY, ETC.
Summary, etc. The dynamic and complex nature of the construction project caused the existence of high uncertainty and tendency for risk accident and incident to happen. Therefore, a comprehensive risk management should be implemented as a regular basic from the beginning of the project. Risk assessment can assist to identify the possible sources of risk and foreseen the possible impact of the risk to the project. It can be carried out through many tools and techniques such as Monte Carlo Simulation, Sensitivity Analysis, Critical Path Method, Fault Tree Analysis and others. Due to the nature of the industry, the duration needed in complex problem decision making process is longer. To ease the complex decision making process, Analytical Hierarchy Process (AHP) can be adopted. The technique has not been widely adopted in the Malaysia construction industry. Therefore, the objective of this study are to (1) identify the actual level of implementation of AHP in risk assessment and (2) to know the limitation when implementing AHP and not implementing AHP in risk assessment in construction industry. AHP is a Multi Criteria Decision Making (MCDM) method which illustrated in a hierarchy structure and pairwise comparison being conducted to obtain the weightage of each alternative and decision is made according to highest score. Research methodology used in this study is quantitative analysis of mean and close-ended survey questionnaire. There are some limitation to this study which included time constraints for data collection, the scope of study only covered specific area and the difficulties in accessing the data from the respondents. Research objective had been answered through the data analysis completed by using Statistical Software for Social Science (SPSS). From the analysis, the implementation of AHP in risk assessment in Pahang construction industry can be considered as low. The individual rating cannot be used as a judgment is the main limitation for AHP implementation as derived from the analysis. Meanwhile, the existence of multiple factors in the project serves as the main limitation on why AHP was not being implemented in the industry. In the future, there are still wide opportunities of this research to be continued in order to contribute in sharing the possible outcome to increase the level of implementation of AHP in the related industry. To promote the technique so that the implementation rate can be increase in the industry, intensive exposure workshop should be provided to the industry players
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Risk in industry
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Risk assessment
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/18803">http://ecollib.ump.edu.my/id/eprint/18803</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD61 .N49 2014 r Bc. 0000100693 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   In Transit UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 8991 | HD61 .N49 2014 r Bc. 0000100694 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us