MARC details
| 000 -LEADER |
| fixed length control field |
02440ntm a2200265 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000091254 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251117113312.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
150917t2014 my da f abm 000 0 eng d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0001529(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905271047 |
| Level of effort used to assign nonsubject heading access points |
asmadi |
| Level of effort used to assign subject headings |
201711291124 |
| Level of effort used to assign classification |
saini |
| -- |
201509171557 |
| -- |
asma |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
HD58.8 .N66 2014 r Bc. |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Noorfatin Liyana Suhaimy |
| 245 12 - TITLE STATEMENT |
| Title |
A study of managing resistance that occurred in construction project / |
| Statement of responsibility, etc. |
Noorfatin Liyana Suhaimy |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2014 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
xi, 69 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. + |
| Accompanying material |
1 CD-ROM |
| 500 ## - GENERAL NOTE |
| General note |
Faculty of Industrial Management |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Project Management with Honours) -- Universiti Malaysia Pahang - 2014 |
| 504 ## - BIBLIOGRAPHY, ETC. NOTE |
| Bibliography, etc. note |
Bibliography : p. 55-60 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
This research was conducted to identify the effective strategy used in managing resistance during project implementation for construction project from the perspective of project manager and project team. Besides that, the objective for this research was to rank the most effective strategy used in managing resistance during project implementation in order to help project manager and project team to be prepared with contingency plan and strategy because every project exposed with the unpredictable things. In this research, the method used for obtaining survey research was questionnaire for collecting the response from the project managers and project team. The Total respondents for this research were 19 from housing developer company that categorized in G2 and located in Negeri Sembilan. Next, Statistical Package for the Social Sciences (SPSS) was used in analyzing these research findings. The result for this research showed that communication plan was the most effective strategy used in managing resistance during project implementation with the highest value of mean. Last but not least, the main suggested recommendation for future research is to study the large number of respondents or participants by include project team from different categories of contractors for more accurate outcome and represent a more realistic population in Malaysia |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Organizational change |
| General subdivision |
Management |
| 856 40 - ELECTRONIC LOCATION AND ACCESS |
| Uniform Resource Identifier |
<a href="http://ecollib.ump.edu.my/id/eprint/18811">http://ecollib.ump.edu.my/id/eprint/18811</a> |
| Public note |
Access in library only |