Study of deserted construction projects in Malaysia / (Record no. 6379)

MARC details
000 -LEADER
fixed length control field 03693ntm a2200289 a 4500
001 - CONTROL NUMBER
control field vtls000092110
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251117113312.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 151118t2015 my da f abm 000 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0000593(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905161013
Level of effort used to assign nonsubject heading access points nazirah
Level of effort used to assign subject headings 201711291525
Level of effort used to assign classification fateeha
-- 201511181243
-- asma
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) FKASA .N39 2015 r Bc.
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nazratul Izzana Ishak
245 10 - TITLE STATEMENT
Title Study of deserted construction projects in Malaysia /
Statement of responsibility, etc. Nazratul Izzana Ishak
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2015
300 ## - PHYSICAL DESCRIPTION
Extent xiv, 130 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm. +
Accompanying material 1 CD ROM
500 ## - GENERAL NOTE
General note Faculty of Civil Engineering and Earth Resources
502 ## - DISSERTATION NOTE
Dissertation note Project Paper (Bachelors of Civil Engineering) -- Universiti Malaysia Pahang – 2015
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc. note Bibliography : p. 113-122
520 3# - SUMMARY, ETC.
Summary, etc. One of the most significant sectors that contribute to Malaysia's economic growth is the construction industries and it supplies a great deal of opportunities to whom involved to flourish in this sector. Even so, deserted construction project (DCP) in Malaysia is considered as one of the most usual and serious problems existing in construction industry nowadays. The desertion of construction projects has resulted in many adverse consequences to the economic system, society and towards environment. This study suggests to identify the reasons that contribute to this problem in order to bring down the negative impact of DCP, and try to determine how to prevent DCP from happen again. Respondents selected for this study were from Class B Contractors to Class A Contractors in peninsular Malaysia that were listed in the current Construction Industry Development Board(CIDB) directory. 170 sets of questionnaires were distributed and 122 questionnaires were returned for further analyses. Foremost, the issues skirting the problem and existing literature on the reasons of DCP are reexamined. Besides, potential reasons of the DCP are also reviewed and summed up into 41 items to be rated in an industry wide questionnaire survey. An open-ended question were also included in the questionnaire to resolve DCP. Afterward, a series of ten semi-structured interviews were conducted to getting detailed opinions from experienced players in the industry concerning the reasons of DCP and how to solve the problems. The interviewees include architects, developers, property consultants, the honorary secretary general of the National House Buyers Association etc. to ensure a comprehensive view was obtained. Quantitative analyses include ranking of the 41 possible reasons of DCP with Spearman‟s ranking correlation between different groups of respondents, and factor analysis with Cronbach‟s α reliability analysis. Qualitative analyses include organizing the results of the open ended question and results of the semi-structured interviews. The discussions included interpret basic factors got from factor analysis based on the outcomes of the qualitative. The outcomes indicated that the owner is mainly responsible for DCP (i.e. cash flow problems, incompetence, siphoning out of money, etc.), followed by the role of government regulations. A risk management expert system module within BIM, a middle ground solution between the sell-then-build and build-then-sell schemes, and others are proposed
610 20 - SUBJECT ADDED ENTRY--CORPORATE NAME
Corporate name or jurisdiction name as entry element Faculty of Civil Engineering and Earth Resources
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Universities and Colleges
General subdivision Dissertations
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Theses
856 40 - ELECTRONIC LOCATION AND ACCESS
Uniform Resource Identifier <a href="http://ecollib.ump.edu.my/id/eprint/25567">http://ecollib.ump.edu.my/id/eprint/25567</a>
Public note Access in library only
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   FKASA .N39 2015 r Bc. 0000104411 04/09/2019 1 04/09/2019 Final Year Report
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   CD 9238 | FKASA .N39 2015 r Bc. 0000104412 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us