Web based progress report for construction / (Record no. 640)

MARC details
000 -LEADER
fixed length control field 02044nam a2200229 a 4500
001 - CONTROL NUMBER
control field vtls000029873
003 - CONTROL NUMBER IDENTIFIER
control field KUKTEM
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20251114204346.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 080702t2007 my f m 000 0 eng|d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number THE0001567(Local)
039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE]
Level of rules in bibliographic description 201905271119
Level of effort used to assign nonsubject heading access points asmadi
Level of effort used to assign subject headings 201107132026
Level of effort used to assign classification VLOAD
Level of effort used to assign subject headings 200908141454
Level of effort used to assign classification VLOAD
Level of effort used to assign subject headings 200908141425
Level of effort used to assign classification VLOAD
-- 200807020907
-- kam
040 ## - CATALOGING SOURCE
Original cataloging agency UMP
090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN)
Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) HD9715 .N89 2007 rs Thesis
100 0# - MAIN ENTRY--PERSONAL NAME
Personal name Nuzulhakimi Ayob
245 10 - TITLE STATEMENT
Title Web based progress report for construction /
Statement of responsibility, etc. Nuzulhakimi Bin Ayob
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. Kuantan, Pahang :
Name of publisher, distributor, etc. UMP,
Date of publication, distribution, etc. 2007
300 ## - PHYSICAL DESCRIPTION
Extent 72 p. :
Other physical details ill. (some col.) ;
Dimensions 30 cm.
502 ## - DISSERTATION NOTE
Dissertation note Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007
520 3# - SUMMARY, ETC.
Summary, etc. At the early construction ages, a lot of contractor use the same ways of data management which is by using the manual data management such as using filing system. This conventional method comes out with a lot of problem such as data overlapping, data is not secure, data is not easily accessible (data has been storage in different file) and time consuming for data exchanging. To prevent such problem, web based progress report for construction has been set up in order to smoothing the management of the data in construction. In the system, Microsoft XP is selected as operating system with the Opera and Internet explorer as browser. For the development of user interface, Macromedia dream weaver 2004 has been use by using CFML programming language. To run the system Macromedia Coldfusion Mx has been use with online purpose. Developing the system with user friendly and attractive interface hopefully can facilitate the administrator and user such as site engineer while using the system. The project report has been prepared aiming to help reader to have clear view of the routes and importance ofthe system as well as obtain the advantage from the system. -Author
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Construction industry
General subdivision Data processing
Holdings
Withdrawn status Lost status Damaged status Not for loan Home library Current library Date acquired Total checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
  Not lost   Not for loan UMPLIB GAMBANG UMPLIB GAMBANG 04/09/2019   HD9715 .N89 2007 rs Thesis 0000030362 04/09/2019 1 04/09/2019 Final Year Report

Perpustakaan Universiti Malaysia Pahang Al-Sultan Abdullah
26600 Pekan, Pahang Darul Makmur
Phone: +609 431 5063 (Gambang) / +609 431 5035 (Pekan)
Email: umplibrary@umpsa.edu.my

Connect With Us