MARC details
| 000 -LEADER |
| fixed length control field |
02044nam a2200229 a 4500 |
| 001 - CONTROL NUMBER |
| control field |
vtls000029873 |
| 003 - CONTROL NUMBER IDENTIFIER |
| control field |
KUKTEM |
| 005 - DATE AND TIME OF LATEST TRANSACTION |
| control field |
20251114204346.0 |
| 008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION |
| fixed length control field |
080702t2007 my f m 000 0 eng|d |
| 020 ## - INTERNATIONAL STANDARD BOOK NUMBER |
| International Standard Book Number |
THE0001567(Local) |
| 039 #9 - LEVEL OF BIBLIOGRAPHIC CONTROL AND CODING DETAIL [OBSOLETE] |
| Level of rules in bibliographic description |
201905271119 |
| Level of effort used to assign nonsubject heading access points |
asmadi |
| Level of effort used to assign subject headings |
201107132026 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
200908141454 |
| Level of effort used to assign classification |
VLOAD |
| Level of effort used to assign subject headings |
200908141425 |
| Level of effort used to assign classification |
VLOAD |
| -- |
200807020907 |
| -- |
kam |
| 040 ## - CATALOGING SOURCE |
| Original cataloging agency |
UMP |
| 090 ## - LOCALLY ASSIGNED LC-TYPE CALL NUMBER (OCLC); LOCAL CALL NUMBER (RLIN) |
| Classification number (OCLC) (R) ; Classification number, CALL (RLIN) (NR) |
HD9715 .N89 2007 rs Thesis |
| 100 0# - MAIN ENTRY--PERSONAL NAME |
| Personal name |
Nuzulhakimi Ayob |
| 245 10 - TITLE STATEMENT |
| Title |
Web based progress report for construction / |
| Statement of responsibility, etc. |
Nuzulhakimi Bin Ayob |
| 260 ## - PUBLICATION, DISTRIBUTION, ETC. |
| Place of publication, distribution, etc. |
Kuantan, Pahang : |
| Name of publisher, distributor, etc. |
UMP, |
| Date of publication, distribution, etc. |
2007 |
| 300 ## - PHYSICAL DESCRIPTION |
| Extent |
72 p. : |
| Other physical details |
ill. (some col.) ; |
| Dimensions |
30 cm. |
| 502 ## - DISSERTATION NOTE |
| Dissertation note |
Project paper (Bachelor of Civil Engineering) -- Universiti Malaysia Pahang - 2007 |
| 520 3# - SUMMARY, ETC. |
| Summary, etc. |
At the early construction ages, a lot of contractor use the same ways of data management which is by using the manual data management such as using filing system. This conventional method comes out with a lot of problem such as data overlapping, data is not secure, data is not easily accessible (data has been storage in different file) and time consuming for data exchanging. To prevent such problem, web based progress report for construction has been set up in order to smoothing the management of the data in construction. In the system, Microsoft XP is selected as operating system with the Opera and Internet explorer as browser. For the development of user interface, Macromedia dream weaver 2004 has been use by using CFML programming language. To run the system Macromedia Coldfusion Mx has been use with online purpose. Developing the system with user friendly and attractive interface hopefully can facilitate the administrator and user such as site engineer while using the system. The project report has been prepared aiming to help reader to have clear view of the routes and importance ofthe system as well as obtain the advantage from the system. -Author |
| 650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM |
| Topical term or geographic name entry element |
Construction industry |
| General subdivision |
Data processing |